What's changing near NE32 3QH
Within 2 km, around Jarrow Town in South Tyneside. Building, planning, schools, transport, prices and crime.
42new homes completed within 2 km, last 2 years
23homes given permission on brownfield sites since 2021
+0.1%like-for-like prices in Jarrow Town, 2024 → 2025 (council +3.6%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Aug 2025
Aug 2025
400 m away - New homes
12 new homes completed6 flats, 6 houses · Mar 2025
Mar 2025
550 m away - New homes
11 new homes completedhouses · Feb 2025
Feb 2025
1.6 km away - New homes
9 new homes completedhouses · Nov 2024
Dec 2024
1.3 km away - Planning permissionDec 2022
550 m away - Planning permissionDec 2022
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 29 m²
10since energy certificates began (2008)
0in NE32 3QH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
24storm overflows within 2 km
5,859hours of spills in 2025 between them (typical neighbourhood: about 36)
941spill events counted
- Northumbrian Water
Howdon Stwinto River Tyne Saline Estuary120 spills, 1,238 hours in 2025
900 m away - Northumbrian Water
Wagonway Road Spsinto River Tyne Saline Estuary100 spills, 1,085 hours in 2025
1.7 km away - Northumbrian Water
Howdon Stwinto River Tyne Saline Estuary113 spills, 795 hours in 2025
900 m away - Northumbrian Water
Tyne View Terrace Psinto River Tyne65 spills, 573 hours in 2025
700 m away - Northumbrian Water
Tyneside Cso (No B5/301)into Don121 spills, 491 hours in 2025
700 m away - Northumbrian Water
South Shields Interceptor Bs/104into River Don90 spills, 467 hours in 2025
750 m away - Northumbrian Water
Tyneside Cso B5/201into River Don63 spills, 334 hours in 2025
550 m away - Northumbrian Water
Jarrow Slake Spsinto River Don27 spills, 192 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
83 planned, approved or being built and 9 running (86 MW between them). Those within 5 km are on the map above.
- Battery storage
Church Bank - Battery Storage SystemPlanning application in · 100 MW
Sept 2025
750 m away - Wind farm
Viking Energy Network, Blackett Street - Turbine RepoweringPlanning application in · 800 kW
Apr 2026
1.4 km away - Rooftop solar
Simonside Industrial Unit, Shaftesbury Avenue - Solar PanelsApproved, not yet built · 360 kW
Oct 2024
1.4 km away - Rooftop solar
UTS Engineering, Pilgrimsway - Solar PanelsApproved, not yet built
Oct 2025
1.5 km away - Rooftop solar
Clarendon, Windmill Way - Solar PanelsApproved, not yet built · 370 kW
Oct 2025
1.7 km away - Battery storage
Port Of Tyne, Tyne Dock - Battery StoragePlanning application in
Jul 2022
1.8 km away - Rooftop solar
Hebburn Lakes Primary School, Campbell Park Road - Solar PV PanelsApproved, not yet built · 250 kW
Nov 2025
2.0 km away - Rooftop solar
Merchant House Warehouse, Tyne Dock - Solar Photovoltaics EquipmentApproved, not yet built · 690 kW
Nov 2023
2.2 km away - Rooftop solar
Border Control Post, Coble Dene - Solar PanelsApproved, not yet built · 250 kW
Sept 2025
2.2 km away - Battery storage
Standby Embedded Stor Power Plant - Battery storageBeing built · 20 MW
Oct 2022
2.4 km away
Road and street works within 1 km
10 permitted works running now or planned, 7 of them major.
- Major, planned
Monkton Road, JarrowHighway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
350 m away - Major
Grange Road, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
400 m away - Major
Walter Street, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
450 m away - Major
Ellison Street, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
550 m away - Major
Station Street, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
600 m away - Major
Grange Road West, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
650 m away - Major
Wear Street, JarrowOptional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026
700 m away - Standard
Straker Street, JarrowHighway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Lane closure
Oct 2026 to Oct 2026
500 m away - Immediate - urgent
Grange Road West, JarrowHighway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Some carriageway incursion
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
3.2 km away - Decideddecided Sept 2018
4.5 km away - Decideddecided Jul 2020
5.5 km away - Decideddecided Jan 2021
10.3 km away - Decideddecided Jul 2013
17.5 km away - Decideddecided Jan 2015
26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Port of Tyne (battery storage, 1.8 km); Howdon STW (other, 4.3 km); Tynemouth Energy Storage System (TESS) (battery storage, 5.1 km); Nissan Test Track (solar farm, 6.9 km); Unipres building (rooftop solar, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.