Country England and Wales › Region North East › Council South Tyneside › Neighbourhood Hebburn West › Postcode NE31 1ED What's changing near NE31 1ED Within 2 km, around Hebburn West in South Tyneside. Building, planning, schools, transport, prices and crime.
176 new homes completed within 2 km, last 2 years
557 homes given permission on brownfield sites since 2021
-0.4% like-for-like prices in Hebburn West, 2024 → 2025 (council +3.6%)
-20% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed flats · Oct 2026
planned Oct 2026 1.5 km away New homes 17 new homes completed houses · Dec 2025 – Oct 2026
Oct 2026 450 m away New homes 95 new homes completed flats · Sep 2026
Oct 2026 400 m away New school New school: Carville Academy Academy sponsor led, primary
May 2026 1.2 km away New homes 27 new homes completed houses · Nov 2024 – Mar 2026
Mar 2026 450 m away New homes 6 new homes completed houses · Jun 2025
Jun 2025 1.2 km away New homes 11 new homes completed houses · Feb 2025
Feb 2025 1.2 km away New school Jan 2025 1.7 km away Planning permission Feb 2023 450 m away Planning permission Permission for 446 homes Former Hawthorn Leslie Shipyard (full planning permission)
Jan 2023 300 m away Planning permission 3 homes extended 2021–2025, typically adding 28 m²
8 since energy certificates began (2008)
0 in NE31 1ED itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 28 storm overflows within 2 km
2,141 hours of spills in 2025 between them (typical neighbourhood: about 36)
600 spill events counted
Northumbrian Water Wagonway Road Sps into River Tyne Saline Estuary 100 spills, 1,085 hours in 2025
1.3 km away Northumbrian Water Burn Closes Cso into Wallsend Burn Estuarine Waters 54 spills, 201 hours in 2025
1.9 km away Northumbrian Water Davy Bank Sps into River Tyne 56 spills, 179 hours in 2025
1.0 km away Northumbrian Water New Welbeck Road Sps into River Tyne 34 spills, 165 hours in 2025
700 m away Northumbrian Water Prince Consort Road Sps into River Tyne 39 spills, 110 hours in 2025
400 m away Northumbrian Water Wincomblee C Pumping Station into River Tyne Saline Estuary 22 spills, 97 hours in 2025
950 m away Northumbrian Water Wallsend Burn Sps into River Tyne 23 spills, 47 hours in 2025
1.9 km away Northumbrian Water Point Pleasant Pumping Station into River Tyne, North Sea 16 spills, 39 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 99 planned, approved or being built and 10 running (88 MW between them). Those within 5 km are on the map above.
Hydrogen Lhyfe Wallsend - Green Hydrogen Plant Approved, not yet built · 20 MW
Jun 2025 900 m away Rooftop solar Soil Machine Dynamic, Davy Bank - Solar Panels Approved, not yet built · 160 kW
Feb 2024 1.0 km away Rooftop solar Tyneview Primary School, Winslow Place - Solar Panels Approved, not yet built · 160 kW
Aug 2023 1.2 km away Rooftop solar Clarendon, Windmill Way - Solar Panels Approved, not yet built · 370 kW
Oct 2025 1.2 km away Rooftop solar Walker Riverside Academy - Photovoltaic Panels Approved, not yet built · 210 kW
Jun 2021 1.3 km away Rooftop solar Hebburn Lakes Primary School, Campbell Park Road - Solar PV Panels Approved, not yet built · 250 kW
Nov 2025 1.4 km away Wind farm Viking Energy Network, Blackett Street - Turbine Repowering Planning application in · 800 kW
Apr 2026 1.5 km away Rooftop solar Unit 1, Walker Riverside, Wincomblee Road -Photovoltaic Panels Approved, not yet built · 270 kW
Jan 2025 1.9 km away Rooftop solar Walkergate Primary School - Photovoltaic Panels Approved, not yet built
Jun 2021 2.2 km away Rooftop solar Benfield School, Benfield Road - Solar Array Approved, not yet built · 410 kW
Aug 2023 2.4 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major Glen Street, Hebburn Optional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away Major Station Road, Hebburn Optional permit (no fee) e.g. for traffic management etc · SOUTH TYNESIDE COUNCIL · Road closure
Nov 2026 to Nov 2026 850 m away Major, planned Rear Of Victoria Road West And Wellington Street, Hebburn Highway repair and maintenance works · SOUTH TYNESIDE COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away Standard Rear Of William Street And Cuthbert Street And Caledonian Street, Hebburn Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Oct 2026 to Oct 2026 400 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 3.7 km away Decided decided Sept 2018 5.4 km away Decided decided Jul 2020 6.4 km away Decided decided Jan 2021 8.5 km away Decided decided Jul 2013 17.6 km away Decided decided Jan 2015 25.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Port of Tyne (battery storage, 4.5 km); Tynemouth Energy Storage System (TESS) (battery storage, 5.4 km); Regent Street - Solar Photovoltaic Panels (solar farm, 5.4 km); Howdon STW (other, 6.7 km); Unipres building (rooftop solar, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.