Country England and Wales › Region North East › Council North Tyneside › Neighbourhood North Shields › Postcode NE29 0NA What's changing near NE29 0NA Within 2 km, around North Shields in North Tyneside. Building, planning, schools, transport, prices and crime.
103 new homes completed within 2 km, last 2 years
123 homes given permission on brownfield sites since 2021
-0.4% like-for-like prices in North Shields, 2024 → 2025 (council +5.1%)
-5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed houses · Apr 2026 – Sep 2026
Sept 2026 2.0 km away New homes 13 new homes completed 3 flats, 10 houses · Dec 2024 – Mar 2026
Mar 2026 600 m away New homes 12 new homes completed houses · Nov 2025 – Feb 2026
Feb 2026 450 m away New homes 6 new homes completed flats · Nov 2025
Dec 2025 500 m away New homes 21 new homes completed houses · Aug 2025 – Dec 2025
Dec 2025 2.0 km away New homes 24 new homes completed houses · Oct 2024 – Jul 2025
Jul 2025 2.0 km away New school Jan 2024 1.2 km away Planning permission Nov 2022 1.5 km away Planning permission Sept 2022 500 m away Planning permission Sept 2022 1.9 km away Planning permission 42 homes extended 2021–2025, typically adding 27 m²
72 since energy certificates began (2008)
2 in NE29 0NA itself
Extended certificate 2025 Extended certificate 2023 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 19 storm overflows within 2 km
636 hours of spills in 2025 between them (typical neighbourhood: about 36)
250 spill events counted
Northumbrian Water Tudor Road Cso into River Tyne Estuarine Waters 42 spills, 149 hours in 2025
2.0 km away Northumbrian Water Wapping Street Cso into River Tyne Estuarine Waters · near bathing water: Littlehaven Beach 58 spills, 147 hours in 2025
1.2 km away Northumbrian Water Coronation St Cso into River Tyne (Estuary) 19 spills, 112 hours in 2025
2.0 km away Northumbrian Water Harton Low Staithes Cso into Tyne Saline Estuary 24 spills, 73 hours in 2025
1.8 km away Northumbrian Water South Shields Pilot Sps into River Tyne (Tidal) · near bathing water: Littlehaven Beach 14 spills, 43 hours in 2025
1.5 km away Northumbrian Water Fish Quay Cso into Tyne Estuary · near bathing water: Littlehaven Beach 15 spills, 39 hours in 2025
1.2 km away Northumbrian Water New Quay Cso Nc058 into Tyne Estuary 14 spills, 26 hours in 2025
1.0 km away Northumbrian Water North Groyne Sps into Tyne Estuary · near bathing water: Littlehaven Beach 12 spills, 16 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 55 planned, approved or being built and 4 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar North Tyneside General Hospital - Solar Panels Approved, not yet built · 980 kW
Nov 2021 1.8 km away Battery storage Hamar Close & Wallsend Road, High Flatworth - Battery Energy Storage Approved, not yet built
Sept 2024 2.2 km away Rooftop solar Border Control Post, Coble Dene - Solar Panels Approved, not yet built · 250 kW
Sept 2025 2.2 km away Battery storage Standby Embedded Stor Power Plant - Battery storage Being built · 20 MW
Oct 2022 2.3 km away Rooftop solar Dunes Amusement Arcade, Sea Road - Solar Panels Approved, not yet built · 150 kW
Mar 2026 2.6 km away Battery storage Venus Park, Trading Estate - Battery Energy Storage Approved, not yet built
Sept 2022 2.7 km away Rooftop solar Westoe Crown Primary School, Sea Winnings Way - Solar Panels Approved, not yet built · 200 kW
Nov 2025 2.7 km away Rooftop solar Unit C, Merlin Way - Solar Panels Approved, not yet built · 530 kW
Dec 2023 3.2 km away Rooftop solar Unit B, Merlin Way - Solar Panels Approved, not yet built · 660 kW
Nov 2023 3.2 km away Rooftop solar Unit A, Merlin Way - Solar Panels Approved, not yet built · 680 kW
Dec 2023 3.3 km away Road and street works within 1 km 5 permitted works running now or planned, 5 of them major.
Major, planned Church Way, North Shields Highway improvement works · NORTH TYNESIDE COUNCIL · Road closure
Oct 2026 to Nov 2026 300 m away Major, planned Bedford Street, North Shields Highway improvement works · NORTH TYNESIDE COUNCIL · Road closure
Oct 2026 to Nov 2026 350 m away Major, planned Howard Street Lane At Rear Of 24-52, North Shields Highway improvement works · NORTH TYNESIDE COUNCIL · Road closure
Oct 2026 to Nov 2026 500 m away Major Upper Pearson Street, North Shields Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Sept 2026 to Nov 2026 600 m away Major, planned Hawkeys Lane, North Shields Highway improvement works · NORTH TYNESIDE COUNCIL · Road closure
Oct 2026 to Nov 2026 600 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 3.0 km away Decided decided Sept 2018 8.0 km away Decided decided Jul 2020 8.8 km away Decided decided Jan 2021 14.2 km away Decided decided Jul 2013 14.6 km away Decided decided Jan 2015 24.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Howdon STW (other, 1.3 km); Tynemouth Energy Storage System (TESS) (battery storage, 3.7 km); Port of Tyne (battery storage, 4.0 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.