107 new homes completed within 2 km, last 2 years
35 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Shiremoor South & West Allotment, 2024 → 2025 (council +5.1%)
+17% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 36 new homes completed houses · Oct 2024 – Sep 2026
Sept 2026 1.9 km away New homes 12 new homes completed houses · Feb 2026 – Sep 2026
Sept 2026 2.0 km away New homes 44 new homes completed houses · Mar 2025 – Sep 2026
Sept 2026 1.8 km away New homes 5 new homes completed houses · Aug 2025
Sept 2025 2.0 km away New homes 8 new homes completed houses · Oct 2024 – Jul 2025
Jul 2025 1.6 km away Planning permission Aug 2022 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 19 m²
12 since energy certificates began (2008)
1 in NE27 0UG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 74 planned, approved or being built and 4 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar Unit A, Merlin Way - Solar Panels Approved, not yet built · 680 kW
Dec 2023 950 m away Rooftop solar Unit C, Merlin Way - Solar Panels Approved, not yet built · 530 kW
Dec 2023 1.1 km away Rooftop solar Unit B, Merlin Way - Solar Panels Approved, not yet built · 660 kW
Nov 2023 1.1 km away Rooftop solar North Tyneside General Hospital - Solar Panels Approved, not yet built · 980 kW
Nov 2021 2.3 km away Battery storage Venus Park, Trading Estate - Battery Energy Storage Approved, not yet built
Sept 2022 3.2 km away Solar farm Backworth Lane, Backworth - Solar Farm Approved, not yet built · 28 MW
May 2023 3.4 km away Battery storage Hamar Close & Wallsend Road, High Flatworth - Battery Energy Storage Approved, not yet built
Sept 2024 3.5 km away Battery storage Standby Embedded Stor Power Plant - Battery storage Being built · 20 MW
Oct 2022 3.5 km away Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Dec 2025 4.0 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 4.0 km away Solar farm Road and street works within 1 km 2 permitted works running now or planned.
Standard Grange Avenue, Shiremoor Highway improvement works · NORTH TYNESIDE COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away Standard Lilburn Road, Shiremoor Utility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 2.7 km away Decided decided Sept 2018 10.3 km away Decided decided Jul 2020 11.3 km away Decided decided Jul 2013 11.7 km away Decided decided Jan 2021 14.5 km away Decided decided Jan 2015 20.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 800 m); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 3.9 km); Howdon STW (other, 5.3 km); Port of Tyne (battery storage, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.