Country England and Wales › Region North East › Council North Tyneside › Neighbourhood Shiremoor South & West Allotment › Postcode NE27 0GH What's changing near NE27 0GH Within 2 km, around Shiremoor South & West Allotment in North Tyneside. Building, planning, schools, transport, prices and crime.
143 new homes completed within 2 km, last 2 years
35 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Shiremoor South & West Allotment, 2024 → 2025 (council +5.1%)
+17% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 26 new homes completed houses · Mar 2026 – Oct 2026
Oct 2026 1.6 km away New homes 44 new homes completed houses · Mar 2025 – Sep 2026
Sept 2026 600 m away New homes 38 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 1.5 km away New homes 24 new homes completed houses · May 2025 – Jul 2025
Jul 2025 1.5 km away New homes 8 new homes completed houses · Apr 2025
Apr 2025 1.5 km away Planning permission Aug 2022 600 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 30 m²
5 since energy certificates began (2008)
0 in NE27 0GH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 77 planned, approved or being built and 8 running (104 MW between them). Those within 5 km are on the map above.
Solar farm Backworth Lane, Backworth - Solar Farm Approved, not yet built · 28 MW
May 2023 1.6 km away Rooftop solar Unit A, Merlin Way - Solar Panels Approved, not yet built · 680 kW
Dec 2023 2.5 km away Rooftop solar Unit C, Merlin Way - Solar Panels Approved, not yet built · 530 kW
Dec 2023 2.6 km away Rooftop solar Unit B, Merlin Way - Solar Panels Approved, not yet built · 660 kW
Nov 2023 2.6 km away Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Dec 2025 3.0 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 3.0 km away Solar farm Seghill Household Waste Recovery Centre - Solar Panels Planning application in · 6 MW
Dec 2025 3.0 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 3.0 km away Battery storage Planet Place, Stephenson Industrial Estate - Unit 27 - Battery Energy Storage Planning application in
Apr 2025 3.2 km away Rooftop solar Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system Approved, not yet built · 1 MW
Apr 2025 3.7 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major Melrose Avenue Lane At Side And Rear Of 23-44, Backworth Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away Major Melrose Avenue, Backworth Utility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Sept 2026 to Oct 2026 950 m away Standard Station Road, Backworth Disconnection or alteration of supply · NORTH TYNESIDE COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 3.7 km away Decided decided Sept 2018 11.1 km away Decided decided Jul 2013 11.3 km away Decided decided Jul 2020 12.1 km away Decided decided Jan 2021 14.2 km away Decided decided Jan 2015 19.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 2.1 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 2.9 km); Howdon STW (other, 7.1 km); Port of Tyne (battery storage, 8.1 km); Cramlington CHP (biomass, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.