Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
172hours of spills in 2025 between them (typical neighbourhood: about 36)
28spill events counted
Northumbrian Water
Seaton Sluice Pumping Stationinto North Sea · near bathing water: Seaton Sluice20 spills, 171 hours in 2025
1.0 km away
Northumbrian Water
West End Csointo Seaton Burn · near bathing water: Seaton Sluice3 spills, 1 hours in 2025
1.6 km away
Northumbrian Water
Hartley Caravan Park Psinto North Sea2 spills, 0 hours in 2025
1.9 km away
Northumbrian Water
Links Road Csointo Seaton Burn · near bathing water: Seaton Sluice2 spills, 0 hours in 2025
700 m away
Northumbrian Water
West End Csointo Seaton Burn · near bathing water: Seaton Sluice1 spills, 0 hours in 2025
Unit A, Merlin Way - Solar PanelsApproved, not yet built · 680 kW
Dec 2023 6.9 km away
Rooftop solar
North Tyneside General Hospital - Solar PanelsApproved, not yet built · 980 kW
Nov 2021 6.9 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.2 km); Blyth Harbour Wind Farm (wind farm, 4.4 km); Blyth Harbour Wind Farm (re-power) (wind farm, 4.8 km); Blyth Sewage Treatment Works (solar farm, 6.2 km); Tynemouth Energy Storage System (TESS) (battery storage, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.