Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
172hours of spills in 2025 between them (typical neighbourhood: about 36)
28spill events counted
Northumbrian Water
Seaton Sluice Pumping Stationinto North Sea · near bathing water: Seaton Sluice20 spills, 171 hours in 2025
950 m away
Northumbrian Water
West End Csointo Seaton Burn · near bathing water: Seaton Sluice3 spills, 1 hours in 2025
450 m away
Northumbrian Water
Hartley Caravan Park Psinto North Sea2 spills, 0 hours in 2025
700 m away
Northumbrian Water
Links Road Csointo Seaton Burn · near bathing water: Seaton Sluice2 spills, 0 hours in 2025
700 m away
Northumbrian Water
West End Csointo Seaton Burn · near bathing water: Seaton Sluice1 spills, 0 hours in 2025
450 m away
Northumbrian Water
Holywell Pumping Stationinto Seaton Burn0 spills, 0 hours in 2025
Low Horton Farm - Solar FarmApproved, not yet built · 50 MW
Nov 2022 6.8 km away
Rooftop solar
Blyth Academy, Chase Farm Drive - Solar PanelsApproved, not yet built · 610 kW
Nov 2025 6.9 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.4 km); Blyth Harbour Wind Farm (wind farm, 5.5 km); Blyth Harbour Wind Farm (re-power) (wind farm, 6.0 km); Tynemouth Energy Storage System (TESS) (battery storage, 6.1 km); Blyth Sewage Treatment Works (solar farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.