What's changing near NE25 9NQ
Within 2 km, around West Monkseaton in North Tyneside. Building, planning, schools, transport, prices and crime.
185new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.7%like-for-like prices in West Monkseaton, 2024 → 2025 (council +5.1%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
67 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.6 km away - New homes
36 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
1.5 km away - New homes
12 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
15 new homes completedhouses · Apr 2026 – Sep 2026
Sept 2026
1.7 km away - New homes
32 new homes completedhouses · Oct 2024 – Nov 2025
Nov 2025
1.5 km away - New homes
5 new homes completedhouses · Aug 2025
Sept 2025
1.4 km away - New homes
8 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1.8 km away - New homes
9 new homes completedhouses · Jan 2025 – Apr 2025
Apr 2025
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
26homes extended 2021–2025, typically adding 26 m²
38since energy certificates began (2008)
0in NE25 9NQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
94hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
- Northumbrian Water
Beehive Csointo Brierdene Burn35 spills, 94 hours in 2025
1.4 km away - Northumbrian Water
Ten Acre Farm Combined Sewer Overflinto Brierdene Burn0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
54 planned, approved or being built and 6 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
North Tyneside General Hospital - Solar PanelsApproved, not yet built · 980 kW
Nov 2021
2.0 km away - Rooftop solar
Unit A, Merlin Way - Solar PanelsApproved, not yet built · 680 kW
Dec 2023
2.1 km away - Rooftop solar
Unit C, Merlin Way - Solar PanelsApproved, not yet built · 530 kW
Dec 2023
2.2 km away - Rooftop solar
Unit B, Merlin Way - Solar PanelsApproved, not yet built · 660 kW
Nov 2023
2.2 km away - Battery storage
Venus Park, Trading Estate - Battery Energy StorageApproved, not yet built
Sept 2022
4.1 km away - Battery storage
Hamar Close & Wallsend Road, High Flatworth - Battery Energy StorageApproved, not yet built
Sept 2024
4.1 km away - Battery storage
Standby Embedded Stor Power Plant - Battery storageBeing built · 20 MW
Oct 2022
4.2 km away - Solar farm
Seghill Household Waste Recovery Centre -Solar PanelsPlanning application in · 6 MW
Dec 2025
4.3 km away - Battery storage
Seghill Household Waste Recovery Centre - BESSPlanning application in
Dec 2025
4.3 km away - Solar farm
Seghill Household Waste Recovery Centre - Solar PanelsPlanning application in · 6 MW
Dec 2025
4.3 km away
Road and street works within 1 km
9 permitted works running now or planned, 8 of them major.
- Major, planned
Earsdon Road, Whitley BayUtility asset works · NORTHUMBRIAN WATER · Give and take
Sept 2026 to Oct 2026
50 m away - Major
Earsdon Road, Whitley BayUtility asset works · NORTHUMBRIAN WATER · Give and take
Sept 2026 to Oct 2026
50 m away - Major
Greenway, Whitley BayUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Sept 2026 to Oct 2026
300 m away - Major
Hatfield Gardens, Whitley BayUtility asset works · NORTHUMBRIAN WATER · Give and take
Sept 2026 to Oct 2026
450 m away - Major
Green Square, Whitley BayUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Sept 2026 to Oct 2026
450 m away - Major
Windsor Road, Whitley BayUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Nov 2026 to Dec 2026
750 m away - Major
Cauldwell Lane, Whitley BayUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Jul 2026 to Oct 2026
850 m away - Major
Bromley Avenue, Whitley BayUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Nov 2026 to Dec 2026
950 m away - Standard
Tarset Road, WellfieldUtility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
3.7 km away - Decideddecided Jul 2013
11.0 km away - Decideddecided Sept 2018
11.1 km away - Decideddecided Jul 2020
12.0 km away - Decideddecided Jan 2021
15.9 km away - Decideddecided Jan 2015
21.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 2.2 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.2 km); Howdon STW (other, 4.9 km); Port of Tyne (battery storage, 7.3 km); Blyth Harbour Wind Farm (wind farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.