Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
110hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Northumbrian Water
Lysndon Farm Csointo Lysdon Burn (Coastal Stream) · near bathing water: Blyth South Beach19 spills, 108 hours in 2025
1.2 km away
Northumbrian Water
Mountford Road Csointo Uunamed Trib Of Lysdon Burn4 spills, 2 hours in 2025
Browns 2000, Colbourne Avenue - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 5.5 km away
Rooftop solar
Advanced Composite Engineering, Colbourne Avenue - Solar PanelsApproved, not yet built · 220 kW
Feb 2023 5.5 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 2.3 km); Blyth Harbour Wind Farm (wind farm, 5.1 km); Blyth Harbour Wind Farm (re-power) (wind farm, 5.5 km); Blyth Sewage Treatment Works (solar farm, 5.8 km); Tynemouth Energy Storage System (TESS) (battery storage, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.