Country England and Wales › Region North East › Council Northumberland › Neighbourhood Seaton Delaval & Seghill › Postcode NE25 0PU What's changing near NE25 0PU Within 2 km, around Seaton Delaval & Seghill in Northumberland. Building, planning, schools, transport, prices and crime.
170 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.8% like-for-like prices in Seaton Delaval & Seghill, 2024 → 2025 (council +3.7%)
-10% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 60 new homes completed houses · Jul 2025 – Oct 2026
Oct 2026 1.5 km away New homes 32 new homes completed houses · Feb 2026 – Oct 2026
Oct 2026 1.7 km away New homes 10 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.7 km away New homes 6 new homes completed houses · Nov 2024 – Apr 2026
Apr 2026 1.7 km away New homes 14 new homes completed houses · Nov 2025 – Mar 2026
Mar 2026 1.5 km away New homes 18 new homes completed houses · Nov 2024 – Jan 2026
Jan 2026 1.8 km away New homes 5 new homes completed houses · Nov 2025 – Jan 2026
Jan 2026 1.8 km away New homes 16 new homes completed houses · Nov 2024 – Aug 2025
Aug 2025 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
3 homes extended 2021–2025, typically adding 35 m²
4 since energy certificates began (2008)
0 in NE25 0PU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
87 hours of spills in 2025 between them (typical neighbourhood: about 36)
57 spill events counted
Northumbrian Water New Mare Close Farm Cso into Seaton Burn 22 spills, 61 hours in 2025
1.2 km away Northumbrian Water Klondyke Cso into Seaton Burn 25 spills, 23 hours in 2025
1.9 km away Northumbrian Water Mountford Road Cso into Uunamed Trib Of Lysdon Burn 4 spills, 2 hours in 2025
1.6 km away Northumbrian Water Seghill Cso into Seaton Burn 6 spills, 1 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 48 planned, approved or being built and 8 running (71 MW between them). Those within 5 km are on the map above.
Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Dec 2025 1.8 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 1.8 km away Solar farm Seghill Household Waste Recovery Centre - Solar Panels Planning application in · 6 MW
Dec 2025 1.8 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 1.8 km away Battery storage Low Horton - Battery Energy Storage System Approved, not yet built · 50 MW
Jan 2025 3.1 km away Solar farm Low Horton Farm - Solar Farm Approved, not yet built · 50 MW
Nov 2022 3.8 km away Rooftop solar Sterling Pharma Solutions - Solar Panels Approved, not yet built · 210 kW
May 2026 3.9 km away Solar farm Backworth Lane, Backworth - Solar Farm Approved, not yet built · 28 MW
May 2023 4.1 km away Rooftop solar Bede Academy North, Sixth Avenue - Solar PV Panels Approved, not yet built · 450 kW
Dec 2025 4.5 km away Rooftop solar Browns 2000, Colbourne Avenue - Solar Panels Approved, not yet built · 990 kW
Mar 2023 4.6 km away Rooftop solar Road and street works within 1 km 3 permitted works running now or planned, 3 of them major.
Major, planned Rothley Grove, Seaton Delaval Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 900 m away Major, planned Blyth Street, Seaton Delaval Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Dec 2026 950 m away Major, planned Prospect Avenue, Seaton Delaval Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Jan 2027 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2013 6.8 km away Decided decided Jan 2016 8.2 km away Decided decided Jan 2015 15.3 km away Decided decided Sept 2018 15.8 km away Decided decided Jul 2020 16.8 km away Decided decided Jan 2021 18.7 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 1.9 km); Cramlington CHP (biomass, 5.5 km); MSD Cramlington (wind farm, 5.9 km); Blyth Harbour Wind Farm (wind farm, 5.9 km); Blyth Sewage Treatment Works (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.