Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
101hours of spills in 2025 between them (typical neighbourhood: about 36)
55spill events counted
Northumbrian Water
Beehive Csointo Brierdene Burn35 spills, 94 hours in 2025
1.9 km away
Northumbrian Water
Westbourne Estate Ssointo Seaton Burn18 spills, 6 hours in 2025
1000 m away
Northumbrian Water
Northside Place Csointo Seaton Burn2 spills, 1 hours in 2025
700 m away
Northumbrian Water
Holywell Pumping Stationinto Seaton Burn0 spills, 0 hours in 2025
800 m away
Northumbrian Water
Ten Acre Farm Combined Sewer Overflinto Brierdene Burn0 spills, 0 hours in 2025
Sterling Pharma Solutions - Solar PanelsApproved, not yet built · 210 kW
May 2026 5.7 km away
Rooftop solar
Bede Academy North, Sixth Avenue - Solar PV PanelsApproved, not yet built · 450 kW
Dec 2025 5.8 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 1.9 km); Tynemouth Energy Storage System (TESS) (battery storage, 4.5 km); Blyth Harbour Wind Farm (wind farm, 6.6 km); Blyth Harbour Wind Farm (re-power) (wind farm, 7.0 km); Blyth Sewage Treatment Works (solar farm, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.