What's changing near NE25 0DL
Within 2 km, around Seaton Delaval & Seghill in Northumberland. Building, planning, schools, transport, prices and crime.
170new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.8%like-for-like prices in Seaton Delaval & Seghill, 2024 → 2025 (council +3.7%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
60 new homes completedhouses · Jul 2025 – Oct 2026
Oct 2026
800 m away - New homes
32 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.6 km away - New homes
10 new homes completedhouses · May 2026 – Aug 2026
Aug 2026
1.6 km away - New homes
6 new homes completedhouses · Nov 2024 – Apr 2026
Apr 2026
1.6 km away - New homes
14 new homes completedhouses · Nov 2025 – Mar 2026
Mar 2026
850 m away - New homes
18 new homes completedhouses · Nov 2024 – Jan 2026
Jan 2026
1.6 km away - New homes
5 new homes completedhouses · Nov 2025 – Jan 2026
Jan 2026
1.7 km away - New homes
16 new homes completedhouses · Nov 2024 – Aug 2025
Aug 2025
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 30 m²
16since energy certificates began (2008)
1in NE25 0DL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
70hours of spills in 2025 between them (typical neighbourhood: about 36)
46spill events counted
- Northumbrian Water
New Mare Close Farm Csointo Seaton Burn22 spills, 61 hours in 2025
1.2 km away - Northumbrian Water
Westbourne Estate Ssointo Seaton Burn18 spills, 6 hours in 2025
1.3 km away - Northumbrian Water
Mountford Road Csointo Uunamed Trib Of Lysdon Burn4 spills, 2 hours in 2025
1.6 km away - Northumbrian Water
Northside Place Csointo Seaton Burn2 spills, 1 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 9 running (77 MW between them). Those within 5 km are on the map above.
- Solar farm
Seghill Household Waste Recovery Centre -Solar PanelsPlanning application in · 6 MW
Dec 2025
1.3 km away - Battery storage
Seghill Household Waste Recovery Centre - BESSPlanning application in
Dec 2025
1.3 km away - Solar farm
Seghill Household Waste Recovery Centre - Solar PanelsPlanning application in · 6 MW
Dec 2025
1.3 km away - Battery storage
Seghill Household Waste Recovery Centre - BESSPlanning application in
Dec 2025
1.3 km away - Solar farm
Backworth Lane, Backworth - Solar FarmApproved, not yet built · 28 MW
May 2023
3.8 km away - Battery storage
Low Horton - Battery Energy Storage SystemApproved, not yet built · 50 MW
Jan 2025
3.9 km away - Rooftop solar
Sterling Pharma Solutions - Solar PanelsApproved, not yet built · 210 kW
May 2026
4.4 km away - Solar farm
Low Horton Farm - Solar FarmApproved, not yet built · 50 MW
Nov 2022
4.6 km away - Rooftop solar
Bede Academy North, Sixth Avenue - Solar PV PanelsApproved, not yet built · 450 kW
Dec 2025
4.9 km away - Rooftop solar
Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV systemApproved, not yet built · 1 MW
Apr 2025
5.1 km away
Road and street works within 1 km
8 permitted works running now or planned, 7 of them major.
- Major, planned
Blyth Street, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Dec 2026
100 m away - Major, planned
Rothley Grove, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027
150 m away - Major, planned
Prospect Avenue, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Jan 2027
200 m away - Major, planned
Starlight Crescent, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026
200 m away - Major, planned
Delaval Avenue, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026
300 m away - Major, planned
Glanton Avenue, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Dec 2026
300 m away - Major, planned
Avenue Road, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Dec 2026 to Dec 2026
350 m away - Standard
Starlight Crescent, Seaton DelavalUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2013
7.2 km away - Decideddecided Jan 2016
7.5 km away - Decideddecided Sept 2018
15.1 km away - Decideddecided Jul 2020
16.1 km away - Decideddecided Jan 2015
16.2 km away - Decideddecided Jan 2021
18.3 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 1.4 km); Tynemouth Energy Storage System (TESS) (battery storage, 5.6 km); Blyth Harbour Wind Farm (wind farm, 6.1 km); Cramlington CHP (biomass, 6.4 km); Blyth Harbour Wind Farm (re-power) (wind farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.