What's changing near NE24 4NA
Within 2 km, around Blyth Newsham in Northumberland. Building, planning, schools, transport, prices and crime.
13new homes completed within 2 km, last 2 years
11homes given permission on brownfield sites since 2021
+3.3%like-for-like prices in Blyth Newsham, 2024 → 2025 (council +3.7%)
-0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 27 m²
21since energy certificates began (2008)
0in NE24 4NA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
1,128hours of spills in 2025 between them (typical neighbourhood: about 36)
209spill events counted
- Northumbrian Water
Blyth (New) Sewage Treatment Worksinto River Blyth (Saline Estuary)31 spills, 381 hours in 2025
1.5 km away - Northumbrian Water
John Street Csointo Blyth Estuary55 spills, 311 hours in 2025
1.6 km away - Northumbrian Water
Cramlington Sewage Treatment Worksinto River Blyth (Saline Estuary)24 spills, 183 hours in 2025
1.6 km away - Northumbrian Water
Cramlington Sewage Treatment Worksinto River Blyth (Saline Estuary)29 spills, 130 hours in 2025
1.6 km away - Northumbrian Water
Bedside Csointo Blyth11 spills, 41 hours in 2025
1.4 km away - Northumbrian Water
Briardale Road Csointo Blyth Estuary25 spills, 40 hours in 2025
1.0 km away - Northumbrian Water
Bank Top Csointo River Blyth26 spills, 36 hours in 2025
1.6 km away - Northumbrian Water
Briardale Road Csointo Blyth Estuary8 spills, 7 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 12 running (494 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Blyth Academy, Chase Farm Drive - Solar PanelsApproved, not yet built · 610 kW
Nov 2025
150 m away - Rooftop solar
Factory C, Coniston Road - Roof repairs & PV ArrayPlanning application in
Jun 2023
1.2 km away - Solar farm
Low Horton Farm - Solar FarmApproved, not yet built · 50 MW
Nov 2022
1.6 km away - Rooftop solar
Bede Academy North, Sixth Avenue - Solar PV PanelsApproved, not yet built · 450 kW
Dec 2025
1.9 km away - Wind farm
East Sleekburn - Wind FarmApproved, not yet built
Nov 2024
2.3 km away - Solar farm
Broadway House Farm Solar FarmApproved, not yet built · 50 MW
Nov 2023
2.7 km away - Battery storage
Broadway House Farm Solar FarmApproved, not yet built
Nov 2023
2.7 km away - Battery storage
High Brockland Farm, Brock Lane - Battery Energy Storage SystemApproved, not yet built · 70 MW
Jan 2026
3.7 km away - Battery storage
West Sleekburn - Battery Storage CompoundApproved, not yet built · 30 MW
Oct 2022
3.9 km away - Rooftop solar
Advanced Composite Engineering, Colbourne Avenue - Solar PanelsApproved, not yet built · 220 kW
Feb 2023
4.4 km away - Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Chase Farm Drive, BlythDiversionary works · BT · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away - Standard
Malton Close, BlythUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away - Standard
Cowpen Hall Road, BlythHighway repair and maintenance works · NORTHUMBERLAND COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2013
2.8 km away - Decideddecided Jan 2015
11.5 km away - Decideddecided Jan 2016
13.0 km away - Decideddecided Sept 2018
20.7 km away - Decideddecided Jul 2020
21.6 km away - Decideddecided May 2024
23.1 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Blyth Sewage Treatment Works (solar farm, 1.3 km); Blyth Harbour Wind Farm (re-power) (wind farm, 3.3 km); Blyth Harbour Wind Farm (wind farm, 3.5 km); MSD Cramlington (wind farm, 5.1 km); Cramlington CHP (biomass, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.