Country England and Wales › Region North East › Council Northumberland › Neighbourhood Blyth Newsham › Postcode NE24 4AG What's changing near NE24 4AG Within 2 km, around Blyth Newsham in Northumberland. Building, planning, schools, transport, prices and crime.
37 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.3% like-for-like prices in Blyth Newsham, 2024 → 2025 (council +3.7%)
-0% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · Nov 2024 – May 2025
May 2025 900 m away New homes 10 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 900 m away New homes 8 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 24 m²
15 since energy certificates began (2008)
1 in NE24 4AG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 32 planned, approved or being built and 7 running (69 MW between them). Those within 5 km are on the map above.
Rooftop solar Bede Academy North, Sixth Avenue - Solar PV Panels Approved, not yet built · 450 kW
Dec 2025 1.0 km away Rooftop solar Blyth Academy, Chase Farm Drive - Solar Panels Approved, not yet built · 610 kW
Nov 2025 1.6 km away Solar farm Low Horton Farm - Solar Farm Approved, not yet built · 50 MW
Nov 2022 2.1 km away Rooftop solar Factory C, Coniston Road - Roof repairs & PV Array Planning application in
Jun 2023 2.6 km away Wind farm East Sleekburn - Wind Farm Approved, not yet built
Nov 2024 3.9 km away Solar farm Broadway House Farm Solar Farm Approved, not yet built · 50 MW
Nov 2023 4.2 km away Battery storage Broadway House Farm Solar Farm Approved, not yet built
Nov 2023 4.2 km away Battery storage Low Horton - Battery Energy Storage System Approved, not yet built · 50 MW
Jan 2025 4.3 km away Rooftop solar Advanced Composite Engineering, Colbourne Avenue - Solar Panels Approved, not yet built · 220 kW
Feb 2023 4.9 km away Rooftop solar Browns 2000, Colbourne Avenue - Solar Panels Approved, not yet built · 990 kW
Mar 2023 4.9 km away Rooftop solar Road and street works within 1 km 2 permitted works running now or planned.
Standard Dunblane Drive, Blyth Utility repair and maintenance works · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away Minor Southend Avenue, Blyth Works for road purposes · NORTHUMBERLAND COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2013 3.2 km away Decided decided Jan 2016 11.5 km away Decided decided Jan 2015 13.3 km away Decided decided Sept 2018 19.2 km away Decided decided Jul 2020 20.1 km away Decided decided Jan 2021 22.3 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Blyth Sewage Treatment Works (solar farm, 2.5 km); Blyth Harbour Wind Farm (wind farm, 2.8 km); Blyth Harbour Wind Farm (re-power) (wind farm, 2.8 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 5.4 km); MSD Cramlington (wind farm, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.