Country England and Wales › Region North East › Council Northumberland › Neighbourhood Blyth South › Postcode NE24 3XA What's changing near NE24 3XA Within 2 km, around Blyth South in Northumberland. Building, planning, schools, transport, prices and crime.
36 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Blyth South, 2024 → 2025 (council +3.7%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · Nov 2024 – May 2025
May 2025 550 m away New homes 10 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 650 m away New homes 8 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 450 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 19 m²
17 since energy certificates began (2008)
1 in NE24 3XA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
108 hours of spills in 2025 between them (typical neighbourhood: about 36)
19 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 32 planned, approved or being built and 7 running (69 MW between them). Those within 5 km are on the map above.
Rooftop solar Bede Academy North, Sixth Avenue - Solar PV Panels Approved, not yet built · 450 kW
Dec 2025 1.2 km away Rooftop solar Blyth Academy, Chase Farm Drive - Solar Panels Approved, not yet built · 610 kW
Nov 2025 2.2 km away Solar farm Low Horton Farm - Solar Farm Approved, not yet built · 50 MW
Nov 2022 2.5 km away Rooftop solar Factory C, Coniston Road - Roof repairs & PV Array Planning application in
Jun 2023 3.1 km away Wind farm East Sleekburn - Wind Farm Approved, not yet built
Nov 2024 4.4 km away Battery storage Low Horton - Battery Energy Storage System Approved, not yet built · 50 MW
Jan 2025 4.4 km away Solar farm Broadway House Farm Solar Farm Approved, not yet built · 50 MW
Nov 2023 4.8 km away Battery storage Broadway House Farm Solar Farm Approved, not yet built
Nov 2023 4.8 km away Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Dec 2025 4.9 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 4.9 km away Solar farm Seghill Household Waste Recovery Centre - Solar Panels
Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2013 3.5 km away Decided decided Jan 2016 11.0 km away Decided decided Jan 2015 13.9 km away Decided decided Sept 2018 18.7 km away Decided decided Jul 2020 19.6 km away Decided decided Jan 2021 21.9 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Blyth Harbour Wind Farm (wind farm, 2.8 km); Blyth Harbour Wind Farm (re-power) (wind farm, 2.9 km); Blyth Sewage Treatment Works (solar farm, 3.0 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 5.0 km); Cramlington CHP (biomass, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.