Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,089hours of spills in 2025 between them (typical neighbourhood: about 36)
147spill events counted
Northumbrian Water
Blyth No. 5 Spsinto River Blyth (Saline Estuary)81 spills, 917 hours in 2025
1.4 km away
Northumbrian Water
South Blyth Harbour Csointo River Blyth (Saline Estuary) · near bathing water: Blyth South Beach34 spills, 153 hours in 2025
850 m away
Northumbrian Water
Blyth No6 Spsinto River Blyth29 spills, 16 hours in 2025
1.8 km away
Northumbrian Water
Warsdell Street Pumping Stationinto Blyth Saline Estuary1 spills, 2 hours in 2025
1.9 km away
Northumbrian Water
Bevan Houseinto Blyth Estuary · near bathing water: Blyth South Beach1 spills, 1 hours in 2025
850 m away
Northumbrian Water
Ridley Street Spsinto River Blyth1 spills, 1 hours in 2025
1.3 km away
Northumbrian Water
Solingen Estate Csointo River Blyth (Saline Estuary) · near bathing water: Blyth South Beach0 spills, 0 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major
U9503 Waterloo Road Back Lane, BlythUtility asset works · NORTHUMBRIAN WATER · Road closure
Dec 2026 to Dec 2026 1000 m away
Major
Union Street, BlythUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Nov 2026 1000 m away
Standard
U9511 Princess Louise Road Back Lane, BlythUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided May 2024 24.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.