Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
Northumbrian Water
Seghill Csointo Seaton Burn6 spills, 1 hours in 2025
1.4 km away
Northumbrian Water
Dudley Middle School Csointo Sandy'S Letch,Trib Seaton Burn2 spills, 1 hours in 2025
Renolit Cramlington Limited, Station Road - Solar PanelsApproved, not yet built · 1 MW
Jun 2024 3.9 km away
Battery storage
Bassington Industrial Estate - Battery Energy Storage SystemApproved, not yet built · 200 kW
Jun 2025 4.0 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 2.8 km); Cramlington CHP (biomass, 4.8 km); MSD Cramlington (wind farm, 5.5 km); Brenkley Landfill (landfill gas, 6.1 km); Tynemouth Energy Storage System (TESS) (battery storage, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.