Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
23hours of spills in 2025 between them (typical neighbourhood: about 36)
25spill events counted
Northumbrian Water
Klondyke Csointo Seaton Burn25 spills, 23 hours in 2025
Seghill Household Waste Recovery Centre - Solar PanelsPlanning application in · 6 MW
Dec 2025 3.0 km away
Battery storage
Seghill Household Waste Recovery Centre - BESSPlanning application in
Dec 2025 3.0 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 3.1 km); Cramlington CHP (biomass, 3.6 km); MSD Cramlington (wind farm, 4.1 km); Blyth Sewage Treatment Works (solar farm, 6.2 km); Brenkley Landfill (landfill gas, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.