Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
24hours of spills in 2025 between them (typical neighbourhood: about 36)
37spill events counted
Northumbrian Water
Klondyke Csointo Seaton Burn25 spills, 23 hours in 2025
1.1 km away
Northumbrian Water
Seghill Csointo Seaton Burn6 spills, 1 hours in 2025
1.6 km away
Northumbrian Water
Dudley Middle School Csointo Sandy'S Letch,Trib Seaton Burn2 spills, 1 hours in 2025
American Air Filter, Bassington Lane - Solar PanelsApproved, not yet built · 600 kW
Mar 2023 3.3 km away
Rooftop solar
Browns 2000, Colbourne Avenue - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 3.3 km away
Running nearest: Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 3.0 km); Cramlington CHP (biomass, 3.9 km); MSD Cramlington (wind farm, 4.5 km); Brenkley Landfill (landfill gas, 6.0 km); Tynemouth Energy Storage System (TESS) (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided May 2024 27.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.