Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
93hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Northumbrian Water
Nelson Village Csointo The Horton Burn (R Blyth)11 spills, 48 hours in 2025
1.2 km away
Northumbrian Water
East Hartford Psinto Horton Burn (River Blyth)12 spills, 45 hours in 2025
38 planned, approved or being built and 10 running (72 MW between them). Those within 5 km are on the map above.
Battery storage
Low Horton - Battery Energy Storage SystemApproved, not yet built · 50 MW
Jan 2025 1.2 km away
Rooftop solar
Advanced Composite Engineering, Colbourne Avenue - Solar PanelsApproved, not yet built · 220 kW
Feb 2023 1.6 km away
Rooftop solar
Browns 2000, Colbourne Avenue - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 1.6 km away
Solar farm
Low Horton Farm - Solar FarmApproved, not yet built · 50 MW
Nov 2022 1.7 km away
Rooftop solar
Moorland Way - Solar PanelsApproved, not yet built · 180 kW
Mar 2025 1.9 km away
Rooftop solar
Renolit Cramlington Limited, Station Road - Solar PanelsApproved, not yet built · 1 MW
Jun 2024 2.2 km away
Rooftop solar
American Air Filter, Bassington Lane - Solar PanelsApproved, not yet built · 600 kW
Mar 2023 2.4 km away
Battery storage
Bassington Industrial Estate - Battery Energy Storage SystemApproved, not yet built · 200 kW
Jun 2025 2.5 km away
Solar farm
Broadway House Farm Solar FarmApproved, not yet built · 50 MW
Nov 2023 3.2 km away
Battery storage
Broadway House Farm Solar FarmApproved, not yet built
Nov 2023 3.2 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major
U9574 Footway From Alderley Way Cul-De-Sac To 23 Alderley Way, CramlingtonUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · No carriageway incursion
Oct 2026 to Oct 2026 550 m away
Standard
U9574 Footway At Rear Of 7-51 Axminster Close, CramlingtonUtility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Feb 2027 to Feb 2027 550 m away
Standard
U9574 Footway Between 15-18 And 20-23 Axminster Close, CramlingtonUtility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Feb 2027 to Feb 2027 550 m away
Standard
Kirkbride Place, CramlingtonUtility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 24.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.