Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
93hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Northumbrian Water
Nelson Village Csointo The Horton Burn (R Blyth)11 spills, 48 hours in 2025
950 m away
Northumbrian Water
East Hartford Psinto Horton Burn (River Blyth)12 spills, 45 hours in 2025
Permission for 7 homesThe Salmon Inn, East Ord, Berwick-Upon-Tweed (full planning permission)
Sept 2024 1.6 km away
Planning permission
Permission for 8 homesBeacon Farm Care Centre, Beacon Lane, Cramlington (full planning permission)
Nov 2023 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
Sterling Pharma Solutions - Solar PanelsApproved, not yet built · 210 kW
May 2026 3.5 km away
Rooftop solar
Blyth Academy, Chase Farm Drive - Solar PanelsApproved, not yet built · 610 kW
Nov 2025 4.2 km away
Running nearest: Cramlington CHP (biomass, 1.9 km); MSD Cramlington (wind farm, 2.3 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 5.0 km); Blyth Sewage Treatment Works (solar farm, 5.4 km); Brenkley Landfill (landfill gas, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 24.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.