Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
71hours of spills in 2025 between them (typical neighbourhood: about 36)
36spill events counted
Northumbrian Water
Nelson Village Csointo The Horton Burn (R Blyth)11 spills, 48 hours in 2025
1.5 km away
Northumbrian Water
Klondyke Csointo Seaton Burn25 spills, 23 hours in 2025
The Salmon Inn, East Ord, Berwick-Upon-Tweed (full planning permission)
Sept 2024 1.7 km away
Planning permission
Permission for 8 homesBeacon Farm Care Centre, Beacon Lane, Cramlington (full planning permission)
Nov 2023 1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Battery storage
Broadway House Farm Solar FarmApproved, not yet built
Nov 2023 3.9 km away
Rooftop solar
North Gosforth Academy, Dudley Lane - Solar PanelsApproved, not yet built · 430 kW
Apr 2026 4.1 km away
Running nearest: Cramlington CHP (biomass, 2.4 km); MSD Cramlington (wind farm, 2.8 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.4 km); Blyth Sewage Treatment Works (solar farm, 5.6 km); Brenkley Landfill (landfill gas, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 25.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.