Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
48hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Northumbrian Water
Nelson Village Csointo The Horton Burn (R Blyth)11 spills, 48 hours in 2025
36 new homes completedhouses · Nov 2024 – Feb 2026
Feb 2026 1.7 km away
New homes
18 new homes completedhouses · Nov 2025 – Dec 2025
Dec 2025 1.6 km away
New homes
13 new homes completedhouses · Jun 2025 – Dec 2025
Dec 2025 1.6 km away
New homes
10 new homes completedhouses · Sep 2025 – Dec 2025
Dec 2025 1.5 km away
New homes
26 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025 1.2 km away
New homes
15 new homes completedhouses · Jul 2025 – Oct 2025
Oct 2025 900 m away
New homes
15 new homes completedhouses · Mar 2025 – Oct 2025
Oct 2025 950 m away
New homes
63 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025 800 m away
New homes
41 new homes completed2 flats, 39 houses · Jan 2025 – Jul 2025
Jul 2025 900 m away
New homes
6 new homes completedhouses · Nov 2024 – Jul 2025
Jul 2025 1.5 km away
New homes
8 new homes completedhouses · Dec 2024 – Jul 2025
Jul 2025 1.3 km away
New homes
8 new homes completedhouses · Dec 2024 – May 2025
May 2025 800 m away
Planning permission
Permission for 7 homesThe Salmon Inn, East Ord, Berwick-Upon-Tweed (full planning permission)
Sept 2024 950 m away
Planning permission
Permission for 8 homesBeacon Farm Care Centre, Beacon Lane, Cramlington (full planning permission)
Nov 2023 950 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Solar farm
Broadway House Farm Solar FarmApproved, not yet built · 50 MW
Nov 2023 3.9 km away
Battery storage
Broadway House Farm Solar FarmApproved, not yet built
Nov 2023 3.9 km away
Running nearest: Cramlington CHP (biomass, 1.7 km); MSD Cramlington (wind farm, 2.2 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 5.0 km); Brenkley Landfill (landfill gas, 5.4 km); Blyth Sewage Treatment Works (solar farm, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided May 2024 25.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.