Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
1,081hours of spills in 2025 between them (typical neighbourhood: about 36)
163spill events counted
Northumbrian Water
Eland Lane (New) Pumping Stationinto Pont47 spills, 511 hours in 2025
550 m away
Northumbrian Water
Jackson Avenue Csointo River Pont38 spills, 244 hours in 2025
150 m away
Northumbrian Water
Memorial Hall Ssointo Pont48 spills, 223 hours in 2025
800 m away
Northumbrian Water
Eastern Way Ssointo Pont29 spills, 103 hours in 2025
1.3 km away
Northumbrian Water
Eland Lane (New) Pumping Stationinto Pont1 spills, 1 hours in 2025
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ponteland: +20% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.1% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.