What's changing near NE20 9ND
Within 2 km, around Darras Hall, Stamfordham & Heddon in Northumberland. Building, planning, schools, transport, prices and crime.
21new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.1%like-for-like prices in Darras Hall, Stamfordham & Heddon, 2024 → 2025 (council +3.7%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 41 m²
7since energy certificates began (2008)
0in NE20 9ND itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 4 running (8 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Ponteland Community Primary School, Callerton Lane - Solar PanelsApproved, not yet built · 470 kW
Mar 2023
3.1 km away - Rooftop solar
Ponteland Leisure Centre, Callerton Lane - Solar PanelsApproved, not yet built
May 2025
3.5 km away - Rooftop solar
Walbottle Campus Technology CollegeApproved, not yet built · 510 kW
Jun 2021
3.7 km away - Solar farm
Newcastle International Airport Phase 1 -Solar FarmBeing built · 3 MW
Oct 2022
5.1 km away - Solar farm
Newcastle International Airport Phase 2 - Solar FarmApproved, not yet built · 4 MW
Feb 2022
5.1 km away - Battery storage
Newcastle International Airport Phase 2 - Battery StorageApproved, not yet built
Feb 2022
5.1 km away - Solar farm
Newcastle International Airport Phase 3- Solar FarmApproved, not yet built · 5 MW
Feb 2022
5.1 km away - Battery storage
Newcastle International Airport Phase 3 - Battery StorageApproved, not yet built
Feb 2022
5.1 km away - Solar farm
Newcastle International Airport Phase 4 - Solar FarmApproved, not yet built · 4 MW
Feb 2022
5.1 km away - Battery storage
Newcastle International Airport Phase 4 - Battery StorageApproved, not yet built
Feb 2022
5.1 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major
Western Way, PontelandHighway improvement works · NORTHUMBERLAND COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
550 m away - Major, planned
U9052 Birney Hall Junction To Callerton Hall Junction, ThrockleyUtility repair and maintenance works · BT · Road closure
Dec 2026 to Dec 2026
900 m away - Standard
Western Way, PontelandHighway repair and maintenance works · NORTHUMBERLAND COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2021
17.0 km away - Decideddecided Jan 2016
17.8 km away - Decideddecided Jan 2015
18.4 km away - Decideddecided Jul 2013
20.8 km away - Decideddecided Sept 2018
21.3 km away - Decideddecided Jul 2020
22.3 km away - Pre-application
Ray II Wind FarmGenerating Stations · Ray II Wind Farm project is located in Northumberland, adjacent (north) to the existing
Ray Wind Farm, approximately 1 km south of Raylees.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Path Head (landfill gas, 7.3 km); Burnhills Landfill Scheme (L4) (landfill gas, 7.7 km); Burnhills Landfill (L5) (landfill gas, 7.7 km); Brenkley Landfill (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.