Country England and Wales › Region North East › Council Newcastle upon Tyne › Neighbourhood Kingston Park › Postcode NE13 7AW What's changing near NE13 7AW Within 2 km, around Kingston Park in Newcastle upon Tyne. Building, planning, schools, transport, prices and crime.
331 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+7.1% like-for-like prices in Kingston Park, 2024 → 2025 (council +5.0%)
+18% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · Mar 2026 – Oct 2026
Oct 2026 1.4 km away New homes 9 new homes completed houses · Sep 2026 – Oct 2026
Oct 2026 1.9 km away New homes 10 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 1.3 km away New homes 32 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 2.0 km away New homes 19 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.8 km away New homes 28 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.4 km away New homes 49 new homes completed houses · Jun 2025 – Jul 2026
Jul 2026 1.9 km away New homes 13 new homes completed houses · Mar 2026 – May 2026
May 2026 1.4 km away New homes 13 new homes completed houses · Sep 2025 – Mar 2026
Mar 2026 1.9 km away New homes 30 new homes completed houses · Oct 2024 – Mar 2026
Mar 2026 1.9 km away New homes 34 new homes completed houses · Dec 2024 – Dec 2025
Dec 2025 2.0 km away New homes 37 new homes completed houses · Jun 2025 – Oct 2025
Oct 2025 1.9 km away 18 homes extended 2021–2025, typically adding 28 m²
28 since energy certificates began (2008)
0 in NE13 7AW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
15 hours of spills in 2025 between them (typical neighbourhood: about 36)
12 spill events counted
Northumbrian Water Acomb Crescent (Cathedral) Cso into Ouse Burn 12 spills, 15 hours in 2025
1.4 km away Northumbrian Water Woolsington Sewage System into Ouse Burn 0 spills, 0 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 86 planned, approved or being built and 8 running (44 MW between them). Those within 5 km are on the map above.
Rooftop solar The Kenton Centre - Solar Panels Approved, not yet built · 160 kW
May 2024 1.6 km away Rooftop solar Brunton First School, Roseden Way - Solar Panels Approved, not yet built · 210 kW
Aug 2023 1.9 km away Rooftop solar Welford Day Centre, Jubilee Road - Solar panels Approved, not yet built · 170 kW
Aug 2023 2.2 km away Rooftop solar Grange First School, Norham Road - Solar Panels Approved, not yet built · 150 kW
Aug 2023 2.4 km away Rooftop solar Saint Nicholas Hospital, Jubilee Road - Solar Panels Approved, not yet built · 230 kW
Mar 2026 2.4 km away Rooftop solar Gosforth Academy - Solar Panels Approved, not yet built · 580 kW
Dec 2025 2.6 km away Rooftop solar Gosforth Academy, Knightsbridge - Solar Panels Approved, not yet built · 520 kW
Sept 2023 2.6 km away Rooftop solar Stamfordham Road - Solar Panels Approved, not yet built · 160 kW
Oct 2021 2.8 km away Solar farm Newcastle International Airport Phase 1 -Solar Farm Being built · 3 MW
Oct 2022 3.1 km away Solar farm Newcastle International Airport Phase 2 - Solar Farm Approved, not yet built · 4 MW
Feb 2022 3.1 km away Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 10.6 km away Decided decided Jan 2021 12.6 km away Decided decided Sept 2018 14.8 km away Decided decided Jul 2020 15.9 km away Decided decided Jul 2013 16.2 km away Decided decided Jan 2015 18.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Brenkley Landfill (landfill gas, 5.6 km); Path Head (landfill gas, 7.3 km); Regent Street - Solar Photovoltaic Panels (solar farm, 7.6 km); Cramlington CHP (biomass, 9.1 km); Burnhills Landfill Scheme (L4) (landfill gas, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.