Within 2 km, around Killingworth East in North Tyneside. Building, planning, schools, transport, prices and crime.
230new homes completed within 2 km, last 2 years
34homes given permission on brownfield sites since 2021
+6.3%like-for-like prices in Killingworth East, 2024 → 2025 (council +5.1%)
-22%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
400 m away - New homes
20 new homes completed8 flats, 12 houses · Jun 2026
Jun 2026
1.3 km away - New homes
38 new homes completedhouses · Jul 2025 – Feb 2026
Feb 2026
500 m away - New homes
12 new homes completedhouses · Jan 2026
Jan 2026
1.7 km away - New homes
29 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025
1.8 km away - New homes
6 new homes completedhouses · Mar 2025 – Nov 2025
Nov 2025
1.8 km away - New homes
8 new homes completedhouses · Dec 2024 – Oct 2025
Oct 2025
1.7 km away - New homes
24 new homes completedhouses · May 2025 – Jul 2025
Jul 2025
550 m away - New homes
8 new homes completedhouses · Nov 2024 – Jun 2025
Jun 2025
1.9 km away - New homes
23 new homes completedhouses · Oct 2024 – Apr 2025
Apr 2025
1.7 km away - New homes
8 new homes completedhouses · Apr 2025
Apr 2025
550 m away - New homes
13 new homes completed9 flats, 4 houses · Dec 2024 – Mar 2025
Mar 2025
1.9 km away
13homes extended 2021–2025, typically adding 29 m²
20since energy certificates began (2008)
0in NE12 9DG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
91 planned, approved or being built and 8 running (104 MW between them). Those within 5 km are on the map above.
- Battery storage
Planet Place, Stephenson Industrial Estate - Unit 27 - Battery Energy StoragePlanning application in
Apr 2025
1.4 km away - Solar farm
Backworth Lane, Backworth - Solar FarmApproved, not yet built · 28 MW
May 2023
1.8 km away - Solar farm
Benton Lane, Quorum Business Park - Solar PanelsPlanning application in · 8 MW
Mar 2026
1.8 km away - Rooftop solar
Quorum Building, Benton Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2026
1.9 km away - Rooftop solar
Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV systemApproved, not yet built · 1 MW
Apr 2025
2.7 km away - Rooftop solar
Corchester Walk - Solar Photovoltaic Panels & Air Sourced Heat PumpsApproved, not yet built · 180 kW
May 2022
2.9 km away - Rooftop solar
YHN House, Benton Park Road- Solar Photovoltaic PanelsApproved, not yet built · 260 kW
Dec 2021
3.4 km away - Rooftop solar
Armadillo Self Storage, Heaton - Solar PanelsApproved, not yet built · 330 kW
Jun 2025
3.7 km away - Rooftop solar
Unit A, Merlin Way - Solar PanelsApproved, not yet built · 680 kW
Dec 2023
3.8 km away - Rooftop solar
Unit B, Merlin Way - Solar PanelsApproved, not yet built · 660 kW
Nov 20233.8 km away
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major
Glebe Road, Forest HallUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Nov 2026
900 m away - Major
Myrtle Crescent, Forest HallUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026
900 m away - Major
Great Lime Road, Forest HallUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026
900 m away - Major
Glebe Villas, Forest HallUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Oct 2026
950 m away - Standard
Glebe Crescent, Forest HallUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Nov 2026 to Nov 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
4.3 km away - Decideddecided Sept 2018
10.9 km away - Decideddecided Jul 2020
11.9 km away - Decideddecided Jul 2013
12.6 km away - Decideddecided Jan 2021
12.8 km away - Decideddecided Jan 2015
19.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 3.4 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.2 km); Regent Street - Solar Photovoltaic Panels (solar farm, 8.1 km); Howdon STW (other, 8.3 km); Port of Tyne (battery storage, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.