Country England and Wales › Region North East › Council North Tyneside › Neighbourhood Killingworth East › Postcode NE12 7FA What's changing near NE12 7FA Within 2 km, around Killingworth East in North Tyneside. Building, planning, schools, transport, prices and crime.
154 new homes completed within 2 km, last 2 years
34 homes given permission on brownfield sites since 2021
+6.3% like-for-like prices in Killingworth East, 2024 → 2025 (council +5.1%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 26 new homes completed houses · Mar 2026 – Oct 2026
Oct 2026 700 m away New homes 20 new homes completed 8 flats, 12 houses · Jun 2026
Jun 2026 1.2 km away New homes 38 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 750 m away New homes 12 new homes completed houses · Jan 2026
Jan 2026 1.3 km away New homes 24 new homes completed houses · May 2025 – Jul 2025
Jul 2025 800 m away New homes 23 new homes completed houses · Oct 2024 – Apr 2025
Apr 2025 2.0 km away New homes 8 new homes completed houses · Apr 2025
Apr 2025 750 m away Planning permission Permission for 22 homes Grasmere Court, Swindale Drive, Killingworth (Former West House PH) (permission in principle) Apr 2023 1.2 km away Planning permission Jul 2022 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 54 m²
18 since energy certificates began (2008)
2 in NE12 7FA itself
Extended certificate 2026 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 90 planned, approved or being built and 8 running (104 MW between them). Those within 5 km are on the map above.
Battery storage Planet Place, Stephenson Industrial Estate - Unit 27 - Battery Energy Storage Planning application in
Apr 2025 950 m away Solar farm Benton Lane, Quorum Business Park - Solar Panels Planning application in · 8 MW
Mar 2026 1.6 km away Solar farm Backworth Lane, Backworth - Solar Farm Approved, not yet built · 28 MW
May 2023 1.7 km away Rooftop solar Quorum Building, Benton Lane - Solar Panels Approved, not yet built · 200 kW
Mar 2026 1.7 km away Rooftop solar Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system Approved, not yet built · 1 MW
Apr 2025 2.3 km away Rooftop solar Corchester Walk - Solar Photovoltaic Panels & Air Sourced Heat Pumps Approved, not yet built · 180 kW
May 2022 2.9 km away Rooftop solar YHN House, Benton Park Road- Solar Photovoltaic Panels Approved, not yet built · 260 kW
Dec 2021 3.2 km away Rooftop solar David Lloyd Leisure, Castles Farm Road - Solar Panels Approved, not yet built · 330 kW
Jul 2023 3.8 km away Rooftop solar Armadillo Self Storage, Heaton - Solar Panels Approved, not yet built · 330 kW
Jun 2025 3.9 km away Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Road and street works within 1 km 7 permitted works running now or planned, 4 of them major.
Major Great Lime Road, Forest Hall Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026 550 m away Major Myrtle Crescent, Forest Hall Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026 600 m away Major Glebe Road, Forest Hall Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Nov 2026 650 m away Major Glebe Villas, Forest Hall Utility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Oct 2026 700 m away Standard Glebe Crescent, Forest Hall Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Nov 2026 to Nov 2026 700 m away Standard Citadel East, Killingworth Utility asset works · Aurora Utilities Limited · Multi-way signals
Oct 2026 to Nov 2026 750 m away Standard Citadel East, Killingworth Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 4.7 km away Decided decided Sept 2018 11.3 km away Decided decided Jul 2020 12.3 km away Decided decided Jul 2013 12.5 km away Decided decided Jan 2021 13.0 km away Decided decided Jan 2015 19.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 3.8 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 4.1 km); Regent Street - Solar Photovoltaic Panels (solar farm, 8.1 km); Brenkley Landfill (landfill gas, 8.4 km); Cramlington CHP (biomass, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.