Country England and Wales › Region North East › Council North Tyneside › Neighbourhood Killingworth East › Postcode NE12 6FF What's changing near NE12 6FF Within 2 km, around Killingworth East in North Tyneside. Building, planning, schools, transport, prices and crime.
157 new homes completed within 2 km, last 2 years
69 homes given permission on brownfield sites since 2021
+6.3% like-for-like prices in Killingworth East, 2024 → 2025 (council +5.1%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 27 new homes completed houses · Mar 2026 – Oct 2026
planned Oct 2026 550 m away New homes 44 new homes completed houses · Mar 2025 – Sep 2026
Sept 2026 1.7 km away New homes 38 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 400 m away New homes 12 new homes completed houses · Jan 2026
Jan 2026 1.9 km away New homes 24 new homes completed houses · May 2025 – Jul 2025
Jul 2025 350 m away New homes 8 new homes completed houses · Apr 2025
Apr 2025 350 m away Planning permission Permission for 22 homes Grasmere Court, Swindale Drive, Killingworth (Former West House PH) (permission in principle) Apr 2023 1.8 km away Planning permission Aug 2022 1.6 km away Planning permission Jul 2022 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 21 m²
7 since energy certificates began (2008)
0 in NE12 6FF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 89 planned, approved or being built and 8 running (104 MW between them). Those within 5 km are on the map above.
Solar farm Backworth Lane, Backworth - Solar Farm Approved, not yet built · 28 MW
May 2023 1.1 km away Battery storage Planet Place, Stephenson Industrial Estate - Unit 27 - Battery Energy Storage Planning application in
Apr 2025 1.9 km away Solar farm Benton Lane, Quorum Business Park - Solar Panels Planning application in · 8 MW
Mar 2026 2.6 km away Rooftop solar Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system Approved, not yet built · 1 MW
Apr 2025 2.7 km away Rooftop solar Quorum Building, Benton Lane - Solar Panels Approved, not yet built · 200 kW
Mar 2026 2.7 km away Solar farm Seghill Household Waste Recovery Centre -Solar Panels Planning application in · 6 MW
Dec 2025 3.4 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 3.4 km away Solar farm Seghill Household Waste Recovery Centre - Solar Panels Planning application in · 6 MW
Dec 2025 3.4 km away Battery storage Seghill Household Waste Recovery Centre - BESS Planning application in
Dec 2025 3.4 km away Rooftop solar Unit A, Merlin Way - Solar Panels Approved, not yet built · 680 kW
Dec 2023 3.4 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2016 4.2 km away Decided decided Sept 2018 11.3 km away Decided decided Jul 2013 11.8 km away Decided decided Jul 2020 12.3 km away Decided decided Jan 2021 13.6 km away Decided decided Jan 2015 19.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tynemouth Energy Storage System (TESS) (battery storage, 3.0 km); Seghill Village Waste Disposal Site phase 1 and 2 (landfill gas, 3.3 km); Howdon STW (other, 8.0 km); Cramlington CHP (biomass, 8.4 km); Port of Tyne (battery storage, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.