Country England and Wales › Region North East › Council Gateshead › Neighbourhood Heworth › Postcode NE10 8PP What's changing near NE10 8PP Within 2 km, around Heworth in Gateshead. Building, planning, schools, transport, prices and crime.
102 new homes completed within 2 km, last 2 years
172 homes given permission on brownfield sites since 2021
+5.4% like-for-like prices in Heworth, 2024 → 2025 (council +3.6%)
-16% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed houses · Mar 2026 – Sep 2026
Sept 2026 1.9 km away New homes 45 new homes completed houses · Oct 2024 – Jul 2026
Jul 2026 1.8 km away New homes 33 new homes completed houses · Oct 2024 – May 2026
May 2026 1.8 km away New homes 6 new homes completed houses · May 2025 – Jun 2025
Jun 2025 100 m away School closed School closed: Colegate Community Primary School Community school, primary (closure)
Dec 2024 550 m away Planning permission Apr 2024 200 m away Planning permission Permission for 17 homes The Hall, Sunderland Road (full planning permission)
Sept 2023 1.6 km away Planning permission Apr 2023 1.9 km away School closed School closed: Cumbric Other independent school, other independent school (closure)
Feb 2023 1.8 km away New school New school: Cumbric Other independent school, other independent school
Oct 2021 1.8 km away New school 6 homes extended 2021–2025, typically adding 22 m²
12 since energy certificates began (2008)
0 in NE10 8PP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 8 storm overflows within 2 km
92 hours of spills in 2025 between them (typical neighbourhood: about 36)
52 spill events counted
Northumbrian Water 4 Aycliffe Avenue Cso into Don 19 spills, 49 hours in 2025
1.6 km away Northumbrian Water Low Heworth Lane Pumping Station into River Tyne Saline Estuary 17 spills, 39 hours in 2025
1.9 km away Northumbrian Water Heworth Shore Cso into Tyne Estuary 2 spills, 2 hours in 2025
1.9 km away Northumbrian Water Cso At Stoneygate Lane into Tyne Estuary 8 spills, 2 hours in 2025
1.9 km away Northumbrian Water Lanchester Avenue Cso into River Don 5 spills, 1 hours in 2025
1.6 km away Northumbrian Water Grassbanks Cso into Don 1 spills, 0 hours in 2025
1.8 km away Northumbrian Water Woodwynd Cso into Don 0 spills, 0 hours in 2025
1.1 km away Northumbrian Water Sheraton Cso into Don 0 spills, 0 hours in 2025
1.8 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 99 planned, approved or being built and 11 running (83 MW between them). Those within 5 km are on the map above.
Rooftop solar Big Yellow Self Storage - Solar Panels Approved, not yet built · 180 kW
Jun 2025 1.6 km away Rooftop solar Donwood Double Glazing, Stonehills Buildings - Unit A23 - Solar Panels Approved, not yet built · 190 kW
Mar 2025 1.6 km away Rooftop solar NCL1, Follingsby Lane - Solar Panels Approved, not yet built · 4 MW
Apr 2023 1.9 km away Rooftop solar Queen Elizabeth Avenue, Sheriff Hill - Solar Arrays Approved, not yet built · 460 kW
Apr 2022 2.2 km away Battery storage Stephenson Road - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 2.5 km away Rooftop solar Robert Duncan Timber Limited, Green Lane - Solar Panels Approved, not yet built · 210 kW
Jan 2023 2.5 km away Rooftop solar Unit 1, Walker Riverside, Wincomblee Road -Photovoltaic Panels Approved, not yet built · 270 kW
Jan 2025 2.6 km away Solar farm Neilson Road - Solar Photovoltaic Array Approved, not yet built · 940 kW
Dec 2021 3.0 km away Rooftop solar Stephenson Industrial Estate, Rutherford Road - Solar Panels Approved, not yet built · 210 kW
Mar 2026 3.3 km away Rooftop solar Snop, Rainhill Road - Solar Panels Approved, not yet built · 1 MW
Sept 2023 3.4 km away Road and street works within 1 km 58 permitted works running now or planned, 54 of them major.
Major, planned Blackthorne, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Nov 2026 550 m away Major Blackthorne, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026 550 m away Major, planned Beechway, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Nov 2026 650 m away Major Beechway, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026 650 m away Major, planned Beechway, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Nov 2026 650 m away Major Glynfellis, Felling Utility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Jan 2027 650 m away Major Glynfellis, Felling Utility asset works · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Nov 2026 700 m away Major Lecondale, Felling Utility asset works · NORTHUMBRIAN WATER · Give and take
Oct 2026 to Nov 2026 750 m away Major, planned Glynfellis Court, Felling Utility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026 750 m away Major, planned Major infrastructure projects within 30 km Decided decided Jan 2021 4.2 km away Decided decided Sept 2018 4.7 km away Decided decided Jul 2020 5.4 km away Decided decided Jan 2016 8.2 km away Decided decided Jul 2013 21.9 km away Decided decided Jan 2015 28.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Regent Street - Solar Photovoltaic Panels (solar farm, 4.0 km); Unipres building (rooftop solar, 4.8 km); Nissan Wind Farm (wind farm, 5.3 km); Nissan Motors Plant Extn (wind farm, 5.3 km); Kibblesworth Landfill Site (landfill gas, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.