What's changing near N19 3RA
Within 2 km, around Archway East in Islington. Building, planning, schools, transport, prices and crime.
264new homes completed within 2 km, last 2 years
47homes given permission on brownfield sites since 2021
+0.8%like-for-like prices in Archway East, 2024 → 2025 (council +2.2%)
+11%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
7 new homes completedflats · Sep 2026
Oct 2026
1.2 km away - New homes
5 new homes completedflats · Jun 2025 – Jun 2026
Jun 2026
1.8 km away - New homes
5 new homes completedflats · Apr 2026
Apr 2026
2.0 km away - New homes
29 new homes completedflats · Dec 2025 – Mar 2026
Mar 2026
1.6 km away - New homes
6 new homes completedhouses · Jul 2025 – Jan 2026
Jan 2026
950 m away - New homes
19 new homes completedflats · Nov 2025
Nov 2025
650 m away - New homes
22 new homes completedflats · Oct 2025
Oct 2025
900 m away - New homes
13 new homes completedflats · Oct 2025
Oct 2025
350 m away - New homes
28 new homes completedflats · Oct 2025
Oct 2025
200 m away - New homes
6 new homes completedflats · Sep 2025
Sept 2025
1.3 km away - School closed
School closed: St Peter-in-Chains RC Infant SchoolVoluntary aided school, primary (closure)
Aug 2025
1.2 km away - School closed
School closed: St Gildas' Catholic Junior SchoolVoluntary aided school, primary (closure)
Aug 2025
1.2 km away
Planning applications within 500 m
142applications in the last 12 months
66approved · 11 refused
42still being decided
21net new homes in approved schemes since 2023
- Application Under Consideration
56, Whitehall Park, N19 3TNTree Work - 56, Whitehall ParkIslington P2026/2645/TRE · All Other
Oct 2026
300 m away - Application Under Consideration
37, Gresley Road, N19 3LA37 Gresley Rd N19 3LAIslington P2026/2637/TRE · All Other
Oct 2026
350 m away - Application Under Consideration
63, Mowatt Close, N19 3XZReplacement of existing windows with double glazed UPVC windowsIslington P2026/2568/FUL · All Other
Oct 2026
500 m away - Approved
43, Whitehall Park, N19 3TWRear garden: T1 - Pear - Completely remove mixed species vine/rose from crown. Reduce crown by 1m all round, to allow more light through to garden T2 - Fig - Reduce laterals by 3m to suitable growth points. Bring height down by 1.5m T3 - Cherry - Light formative prune T4 - Birch - Reduce back overhang from neighbours garden to suitable growth points. Lift to give Cherry & Camellia suffIslington P2026/2552/TRE · All Other
Oct 2026
300 m away - Application Under Consideration
40, Highgate Hill, N19 5NQT1 - sycamore tree (14m) - take down to ground level.Islington P2026/2485/TRE · All Other
Sept 2026
400 m away - Application Under Consideration
60, Dresden Road, N19 3BQConversion + extension (excavation) of existing basement cellar/storage into living area, including a front lightwell with flush floor metal grill to provide egress exit and natural daylight Written advice with site visit £584 £116.80 £700.80Islington P2026/2590/PHH · All Other
Sept 2026
400 m away
24homes extended 2021–2025, typically adding 27 m²
69since energy certificates began (2008)
1in N19 3RA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
55 planned, approved or being built and 5 running (61 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Waste & Recycling centre, Hornsey Street - Solar panelsApproved, not yet built · 430 kW
Nov 2023
2.4 km away - Rooftop solar
Henderson Court, Fitzjohns Avenue - Solar PanelsApproved, not yet built · 170 kW
Nov 2022
3.3 km away - Rooftop solar
Wood Green Shopping City, High Road - Solar ArrayApproved, not yet built · 310 kW
Mar 2026
3.4 km away - Rooftop solar
London Zoo, Outer Circle - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
3.9 km away - Rooftop solar
London St Pancras International Station - Installation Of Solar PanelsApproved, not yet built
4.1 km away - Rooftop solar
University College Hospital, Euston Road - Solar PanelsApproved, not yet built · 180 kW
Nov 2022
4.8 km away - Rooftop solar
High Road - Solar PV PanelsApproved, not yet built · 180 kW
Oct 2021
4.9 km away - Rooftop solar
David Lloyd Leisure Centre, Leisure Way - Solar PanelsApproved, not yet built · 330 kW
Jan 2024
5.1 km away - Other
Windmill Court - CommunityPlanning application in
Jan 2025
5.5 km away - Rooftop solar
Friern Barnet School, Hemington Avenue - Solar PanelsApproved, not yet built · 170 kW
Jul 2025
5.5 km away
Road and street works within 1 km
30 permitted works running now or planned, 8 of them major.
- Major
Archway Road, LondonOptional permit (no fee) e.g. for traffic management etc · TRANSPORT FOR LONDON (TFL) · No carriageway incursion
Apr 2026 to Apr 2027
150 m away - Major
Mulkern Road, LondonUtility asset works · CADENT GAS LIMITED · Multi-way signals
Sept 2026 to Oct 2026
400 m away - Major
St John'S Way, LondonUtility asset works · CADENT GAS LIMITED · Road closure
Sept 2026 to Oct 2026
450 m away - Major
Courtauld Road, LondonUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Nov 2026
550 m away - Major
Sussex Way, LondonUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Nov 2026
550 m away - Major
Fairbridge Road, LondonUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026
600 m away - Major, planned
Chester Road, LondonDisconnection or alteration of supply · THAMES WATER · Road closure
Nov 2026 to Nov 2026
750 m away - Major, planned
Cholmeley Park, LondonUtility asset works · THAMES WATER · Road closure
Nov 2026 to Jan 2027
750 m away - Standard
Highgate Hill, LondonHighway repair and maintenance works · LONDON BOROUGH OF ISLINGTON · Multi-way signals
Oct 2026 to Nov 2026
550 m away - Minor
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
6.7 km away - Decideddecided Apr 2014
7.2 km away - Decideddecided Feb 2017
8.5 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
12.5 km away - Pre-applicationapplication due March 2028
13.3 km away - Pre-applicationapplication due March 2027
18.3 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
Transport schemes within 20 km
- Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
6.5 km away - TransportMay 2022
6.5 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
9.1 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
9.8 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
9.9 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
18.0 km away
Running nearest: Holly Street - Solar PV Panels (rooftop solar, 5.2 km); Advent Way - Solar Panels (rooftop solar, 7.8 km); Edmonton EcoPark EfW (energy from waste, 8.4 km); Deephams Sewerage Treatment Works (anaerobic digestion, 9.1 km); King's Yard (biomass, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.