Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN, Fountayne Road, N15 4QNNon-material amendment to planning permission ref. HGY/2025/2192 for the re-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections. Amendment to use artificial slates instead of composite panels.Haringey HGY/2026/2100 · All Other
Aug 2026 450 m away
Approved
87 Yarmouth Crescent, Tottenham, London, N17 9PQ, Yarmouth Crescent, N17 9PQErection of a single storey rear extension.Haringey HGY/2026/2191 · Householder
Aug 2026 200 m away
Approve
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE, Fountayne Road, N15 4BENon-Material Amendment to planning permission HGY/2025/2252 comprising repair of existing windows, replacement of cladding, existing windows extended to full height, fill in and rendered entrance door, replace existing roller shutter. The proposed minor amendments relate to changes required to ensure their operational requirements can be met and that the proposed works are aligned with the approvHaringey HGY/2026/0820 · All Other
Mar 2026 350 m away
Approved
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE, Fountayne Road, N15 4BEAdvertisement Consent for the display of six non-illuminated signs and four illuminated signsHaringey HGY/2026/0830 · All Other
Mar 2026 350 m away
Refused
72 Yarmouth Crescent, Tottenham, London, N17 9PQ, Yarmouth Crescent, N17 9PQChange of use from a single family dwellinghouse (Class C3) into a small scale HMO (Class C4) with 4 bedrooms for 4 occupants.Haringey HGY/2025/3324 · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
145hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Thames Water
St Andrews Road, Black Horse Laneinto Dagenham Brook6 spills, 114 hours in 2025
1.5 km away
Thames Water
Low Hall Farm Storm Tanksinto Dagenham Brook5 spills, 31 hours in 2025
1.8 km away
Thames Water
Markfield Park Cso / Stonebridge Bkinto River Lee0 spills, 0 hours in 2025
New school: Clockhouse Primary SchoolOther independent school, other independent school
Dec 2024 1.6 km away
Planning permission
Permission for 300 homesStandard Music Venue The Tryst, 1 Blackhorse Lane (full planning permission)
Feb 2021 1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 37 postcodes nearby had new homes completed in the last two years.
Approved
Unit 3a, High Cross Centre, Fountayne Road, Tottenham, London, N15 4QN, Fountayne Road, N15 4QNRe-roofing with removal of slates with composite panels, with installation of solar panels to south roof sections.Haringey HGY/2025/2192 · All Other
Aug 2025 450 m away
Approved
4 Erskine Crescent, Tottenham, London, N17 9PA, Erskine Crescent, N17 9PAInstallation of air source heat pumpHaringey HGY/2025/1723 · Householder
Jun 2025 350 m away
Approve
Unit 9, High Cross Centre, Fountayne Road, Tottenham, London, N15 4BE., Fountayne Road, N15 4BECertificate of lawfulness for the existing use of the premises for distribution and storage (Class B8 Use).Haringey HGY/2025/1329 · All Other
Jun 2025 350 m away
Permitted Development
113 Yarmouth Crescent, Tottenham, London, N17 9PH, Yarmouth Crescent, N17 9PHCertificate of Lawfulness: Proposed use for formation of rear dormer roof extension, installation of roof lights to front slope, replacement of windows to match, erection of rear garden room, change of existing garage door to sliding doors and conversion of garage to habitable room.Haringey HGY/2025/1196 · All Other
May 2025 50 m away
Permitted Development
Coppermill Heights, Ferry Lane, Tottenham, London, N17 9FG, Ferry Lane, N17 9FGFormal notification in writing of 28 days notice in advance, in accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended). Description of Development: The proposed development comprises the installation of 3no. antennas, 1no. 300mm dish, the installation of 2no. cabinets at roof level, and ancillary works thereto.Haringey HGY/2024/2856 · Prior Approval
Oct 2024 450 m away
Approved
36 Erskine Crescent, Tottenham, London, N17 9PA, Erskine Crescent, N17 9PAConversion of garage to habitable space, installation of front roof light and replacement of windows and doorsHaringey HGY/2024/2829 · Householder
Oct 2024 300 m away
Approved
Unit 8, Tottenham Hale Retail Park, Broad Lane, Tottenham, London, N15 4QD, Broad Lane, N15 4QDDisplay of fascia sign over entrance to replace existing signage, with individual illuminated letters and logoHaringey HGY/2024/2632 · All Other
Sept 2024 450 m away
Approved
Unit 1 Navigation Point 2, Hale Wharf, Ferry Lane, Tottenham, London, N17 9LW, Ferry Lane, N17 9LWInternally -illuminated fascia signs, projection sign, associated vinyl signsHaringey HGY/2024/2230 · All Other
Aug 2024 400 m away
Approved
Unit C5, Tottenham Hale Retail Park, Broad Lane, Tottenham, London, N15 4QD, Broad Lane, N15 4QDConsent to display 1No. Replacement Internally illuminated fascia sign and 2no. Sets of glazing graphics to front elevation and 2No. Fascia signs to side elevation.Haringey HGY/2024/1727 · All Other
Jun 2024 400 m away
Approved
TK Maxx, Unit 5, Tottenham Hale Retail Park, Broad Lane, Tottenham, London, N15 4QD, Broad Lane, N15 4QDExternal alterations to reconfigure part of the front elevation to replace an area of glazing with a new fire door.Haringey HGY/2024/0972 · All Other
Apr 2024 400 m away
Approved
TK Maxx, Unit 5, Tottenham Hale Retail Park, Broad Lane, Tottenham, London, N15 4QD, Broad Lane, N15 4QDInstallation of Additional Floorspace at Mezzanine LevelHaringey HGY/2024/0728 · All Other
Apr 2024 400 m away
Opinion Issued
2 Forest Road, Walthamstow, London, N17 9NH, N17 9NHReplacement of two transformers – within the existing building. Replacement of a switchgear – within the existing building. Installation of two neutral earthing resistors – within the existing building. Installation of two electricity ring main units (measuring approximately: 3 x 3 x 2.4mh & 3.5 x 3.75 x 2.35mh respectively). Installation of new electricity cable ducts. Extension of existing secuWaltham Forest 230465 · All Other
Mar 2023 350 m away
Approved
STREET RECORD, FOREST ROADVariation of conditions 17 (Hours of Operation) and 18 (Delivery Hours) of planning permission reference 182917 dated 18th February 2019 to allow an extension of operation of two hours of Unit 01 on Sundays and Bank Holidays and deliveries between 9AM and 9PM on Sundays, Bank Holidays or Public Holidays. Waltham Forest 223636 · All Other
Jan 2023 350 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Waste & Recycling centre, Hornsey Street - Solar panelsApproved, not yet built · 430 kW
Nov 2023 5.7 km away
Rooftop solar
Edmonton lower school - Solar PanelsApproved, not yet built · 250 kW
Mar 2024 5.7 km away
Running nearest: Advent Way - Solar Panels (rooftop solar, 3.2 km); Edmonton EcoPark EfW (energy from waste, 3.7 km); Holly Street - Solar PV Panels (rooftop solar, 4.8 km); Deephams Sewerage Treatment Works (anaerobic digestion, 4.8 km); King's Yard (biomass, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Nov 2025 17.3 km away
Decided
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.