Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Two Mile Ash › Postcode MK8 8HY What's changing near MK8 8HY Within 2 km, around Two Mile Ash in Milton Keynes. Building, planning, schools, transport, prices and crime.
529 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.6% like-for-like prices in Two Mile Ash, 2024 → 2025 (council +1.3%)
+14% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 14 new homes completed 1 flats, 13 houses · Sep 2025 – Oct 2026
Oct 2026 1.5 km away New homes 15 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1.4 km away New homes 6 new homes completed 1 flats, 5 houses · Aug 2025 – Sep 2026
Sept 2026 1.4 km away New homes 9 new homes completed houses · May 2026 – Sep 2026
Sept 2026 1.5 km away New homes 16 new homes completed houses · Oct 2024 – Jul 2026
Jul 2026 1.4 km away New homes 21 new homes completed houses · Aug 2025 – Jul 2026
Jul 2026 1.6 km away New homes 13 new homes completed houses · Oct 2024 – Jul 2026
Jul 2026 1.3 km away New homes 6 new homes completed flats · May 2026
May 2026 1.6 km away New homes 29 new homes completed 3 flats, 26 houses · Mar 2025 – May 2026
May 2026 1.6 km away New homes 37 new homes completed houses · Oct 2024 – Apr 2026
Apr 2026 1.6 km away New homes 14 new homes completed houses · Oct 2024 – Apr 2026
Apr 2026 1.6 km away New homes 23 new homes completed 1 flats, 22 houses · Nov 2024 – Feb 2026
Feb 2026 1.3 km away 11 homes extended 2021–2025, typically adding 36 m²
23 since energy certificates began (2008)
0 in MK8 8HY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 69 planned, approved or being built and 14 running (135 MW between them). Those within 5 km are on the map above.
Rooftop solar Volkswagen Group UK, Garamonde Drive - Solar Panels Approved, not yet built · 700 kW
Jan 2025 300 m away Rooftop solar Brioche Pasquier UK, Garamonde Drive - Solar Canopies Approved, not yet built · 610 kW
Jan 2025 400 m away Battery storage The Church Of The Latterday Saints, The High Street - Battery Storage Approved, not yet built · 200 kW
Jan 2025 500 m away Battery storage Alston Drive, Bradwell Abbey - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 650 m away Battery storage Bradwell Road - Micro Storage Facility Approved, not yet built · 200 kW
Jan 2026 1000 m away Rooftop solar Bradwell Road, Loughton Lodge - Solar Panels Approved, not yet built · 520 kW
Jun 2022 1.1 km away Rooftop solar Deltic Avenue, Rooksley - Solar Panels Approved, not yet built · 260 kW
May 2024 1.3 km away Rooftop solar Ingram Content Group UK, Chapter House - Solar Panels Approved, not yet built · 980 kW
Aug 2023 1.4 km away Rooftop solar Burners Lane, Kiln Farm - Solar Panels Approved, not yet built · 500 kW
Aug 2025 1.9 km away Rooftop solar Vodafone, Fingle Drive - Solar PV Panels Approved, not yet built · 340 kW
Mar 2023 2.1 km away Road and street works within 1 km 8 permitted works running now or planned, 6 of them major.
Major, planned Chatsworth, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Major Chatsworth, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Major, planned Petworth, Milton Keynes Utility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · Road closure
Dec 2026 to Dec 2026 900 m away Major Petworth, Milton Keynes Utility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · Road closure
Oct 2026 to Nov 2026 900 m away Major, planned Watling Street H4 To H5, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away Major Watling Street H4 To H5, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away Standard Crownhill Roundabout, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 900 m away Minor Westwood Close, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2019 17.4 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 17.9 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 19.0 km away Decided decided Oct 2011 19.5 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 22.9 km away Decided decided Sept 2014 25.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Hazeley Academy (rooftop solar, 2.6 km); Falcon Project (battery storage, 2.8 km); Milton Keynes Waste Recovery Park (energy from waste, 3.0 km); Land At Potash Farm (solar farm, 5.2 km); Stony Energy Storage Facility (battery storage, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.