Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Fairfields & Grange Farm › Postcode MK8 0PE What's changing near MK8 0PE Within 2 km, around Fairfields & Grange Farm in Milton Keynes. Building, planning, schools, transport, prices and crime.
1,036 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.6% like-for-like prices in Fairfields & Grange Farm, 2024 → 2025 (council +1.3%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 27 new homes completed 8 flats, 19 houses · Mar 2026 – Oct 2026
Oct 2026 1.2 km away New homes 14 new homes completed 1 flats, 13 houses · Sep 2025 – Oct 2026
Oct 2026 1.9 km away New homes 17 new homes completed houses · Jul 2026 – Oct 2026
Oct 2026 1.2 km away New homes 11 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 1.2 km away New homes 9 new homes completed 2 flats, 7 houses · Oct 2025 – Sep 2026
Sept 2026 750 m away New homes 9 new homes completed houses · May 2026 – Sep 2026
Sept 2026 1.8 km away New homes 7 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1000 m away New homes 31 new homes completed houses · Jan 2026 – Aug 2026
Aug 2026 1.1 km away New homes 16 new homes completed houses · Apr 2026 – Aug 2026
Aug 2026 1.3 km away New homes 25 new homes completed 1 flats, 24 houses · Apr 2025 – Aug 2026
Aug 2026 950 m away New homes 16 new homes completed houses · Oct 2024 – Jul 2026
Jul 2026 2.0 km away New homes 21 new homes completed houses · Aug 2025 – Jul 2026
Jul 2026 2.0 km away 11 homes extended 2021–2025, typically adding 23 m²
25 since energy certificates began (2008)
1 in MK8 0PE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 68 planned, approved or being built and 14 running (141 MW between them). Those within 5 km are on the map above.
Battery storage The Church Of The Latterday Saints, The High Street - Battery Storage Approved, not yet built · 200 kW
Jan 2025 2.0 km away Battery storage Bradwell Road - Micro Storage Facility Approved, not yet built · 200 kW
Jan 2026 2.4 km away Rooftop solar Bradwell Road, Loughton Lodge - Solar Panels Approved, not yet built · 520 kW
Jun 2022 2.5 km away Rooftop solar Volkswagen Group UK, Garamonde Drive - Solar Panels Approved, not yet built · 700 kW
Jan 2025 2.5 km away Rooftop solar Ingram Content Group UK, Chapter House - Solar Panels Approved, not yet built · 980 kW
Aug 2023 2.6 km away Rooftop solar Brioche Pasquier UK, Garamonde Drive - Solar Canopies Approved, not yet built · 610 kW
Jan 2025 2.7 km away Solar farm Oaks Farm - Solar Farm Approved, not yet built · 37 MW
May 2026 2.7 km away Battery storage Kelvin Drive - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 2.8 km away Rooftop solar Deltic Avenue, Rooksley - Solar Panels Approved, not yet built · 260 kW
May 2024 2.8 km away Battery storage Alston Drive, Bradwell Abbey - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 2.9 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 15.6 km away Decided decided Oct 2019 19.3 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 19.9 km away Decided decided Oct 2011 20.5 km away Decided decided Sept 2014 24.6 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 25.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Hazeley Academy (rooftop solar, 300 m); Land At Potash Farm (solar farm, 3.8 km); Falcon Project (battery storage, 4.0 km); Stony Energy Storage Facility (battery storage, 4.1 km); Milton Keynes Waste Recovery Park (energy from waste, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.