Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Denbigh › Postcode MK6 4JA What's changing near MK6 4JA Within 2 km, around Denbigh in Milton Keynes. Building, planning, schools, transport, prices and crime.
46 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+12.0% like-for-like prices in Denbigh, 2024 → 2025 (council +1.3%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 17 new homes completed houses · May 2026 – Sep 2026
Sept 2026 1.5 km away New homes 14 new homes completed houses · Mar 2026 – Sep 2026
Sept 2026 1.5 km away New homes 6 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.6 km away New homes 7 new homes completed houses · Nov 2025 – Mar 2026
Mar 2026 1.9 km away New school New school: Langland Community School Academy sponsor led, primary
Jan 2022 300 m away New school New school: Baytul Ilm Secondary School Other independent school, other independent school
Jun 2021 750 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 21 m²
14 since energy certificates began (2008)
0 in MK6 4JA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 67 planned, approved or being built and 18 running (131 MW between them). Those within 5 km are on the map above.
Rooftop solar Thornbury, West Ashland - Solar Photovoltaic System Approved, not yet built · 880 kW
Mar 2023 700 m away Rooftop solar Dawson Road, Bletchley - Solar Panels Approved, not yet built · 280 kW
Aug 2022 1.0 km away Rooftop solar Dawson Rentals Vans, Dawson Road - Solar Carport Canopy & BESS Approved, not yet built · 260 kW
May 2024 1.0 km away Rooftop solar Dawson Road, Bletchley - Solar Photovoltaic Panels Planning application in · 260 kW
Oct 2021 1.1 km away Battery storage Grafton Street, End Of Dunsby Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 1.2 km away Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 1.6 km away Rooftop solar Unit 2, Watling Street - Solar Panels Approved, not yet built · 230 kW
Jul 2024 1.7 km away Rooftop solar The Milton Keynes Academy, Fulwoods Drive - Solar Panels Approved, not yet built · 350 kW
Dec 2025 1.7 km away Rooftop solar Third Avenue, Bletchley - Solar Panels Approved, not yet built · 230 kW
Nov 2025 1.8 km away Rooftop solar Sensient Flavours, Bilton Road - Solar Panels Approved, not yet built · 470 kW
May 2023 1.8 km away Road and street works within 1 km 8 permitted works running now or planned, 3 of them major.
Major, planned Farthing Grove, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Major Farthing Grove, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Major, planned Tandra, Milton Keynes Utility asset works · BT · Road closure
Jan 2027 to Jan 2027 600 m away Standard Chervil, Milton Keynes Disconnection or alteration of supply · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Nov 2026 to Nov 2026 750 m away Standard Standing Way V8 To V10, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 800 m away Standard Chervil, Milton Keynes Disconnection or alteration of supply · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Oct 2026 to Oct 2026 850 m away Immediate - emergency Redway Ne01 Netherfield, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · No carriageway incursion
Jul 2026 to Oct 2026 800 m away Minor Coffee Hall Roundabout, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 14.6 km away Decided decided Oct 2011 15.2 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 19.1 km away Decided decided Sept 2014 19.8 km away Decided decided Oct 2019 22.1 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 24.9 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 2.7 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 2.8 km); Falcon Project (battery storage, 3.2 km); Blum Uk - Solar Panels (rooftop solar, 3.6 km); Bletchley Phase II (landfill gas, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.