21 new homes completed15 flats, 6 houses · May 2025 – Jun 2025
Jun 2025 1.4 km away
New homes
15 new homes completedflats · Jun 2025
Jun 2025 1.3 km away
New homes
21 new homes completedhouses · Nov 2024 – May 2025
May 2025 1.5 km away
New homes
41 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025 1.4 km away
New homes
22 new homes completed5 flats, 17 houses · Nov 2024 – Mar 2025
Mar 2025 1.7 km away
New homes
14 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 26 postcodes nearby had new homes completed in the last two years.
38 m² → 67 m² (+29 m²)
certificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Battery storage
Pear Tree Lane, Bleak Hall - Micro Energy StorageApproved, not yet built · 200 kW
Feb 2025 3.7 km away
Rooftop solar
Deltic Avenue, Rooksley - Solar PanelsApproved, not yet built · 260 kW
May 2024 3.8 km away
Running nearest: The Hazeley Academy (rooftop solar, 1.1 km); Land At Potash Farm (solar farm, 4.0 km); Stony Energy Storage Facility (battery storage, 4.3 km); Bletchley Phase II (landfill gas, 4.5 km); Falcon Project (battery storage, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Rail Freight Interchanges · Land west of the B430, east of Upper Heyford Former Airfield, and south of the village of Ardley
application due March 2026 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.