Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Tattenhoe & Emerson Valley › Postcode MK4 4GE What's changing near MK4 4GE Within 2 km, around Tattenhoe & Emerson Valley in Milton Keynes. Building, planning, schools, transport, prices and crime.
578 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Tattenhoe & Emerson Valley, 2024 → 2025 (council +1.3%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · May 2026 – Oct 2026
Oct 2026 1.4 km away New homes 24 new homes completed 10 flats, 14 houses · Apr 2026 – Oct 2026
Oct 2026 1.4 km away New homes 11 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 1.1 km away New homes 8 new homes completed 1 flats, 7 houses · Nov 2025 – Oct 2026
Oct 2026 1.2 km away New homes 6 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 2.0 km away New homes 7 new homes completed 2 flats, 5 houses · Oct 2025 – Sep 2026
Sept 2026 1.1 km away New homes 12 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1.2 km away New homes 23 new homes completed houses · Aug 2025 – Aug 2026
Aug 2026 1.1 km away New homes 19 new homes completed houses · Nov 2025 – Aug 2026
Aug 2026 1.1 km away New homes 16 new homes completed houses · Apr 2026 – Aug 2026
Aug 2026 1.7 km away New homes 13 new homes completed 11 flats, 2 houses · Mar 2026 – Aug 2026
Aug 2026 1.5 km away New homes 8 new homes completed houses · Aug 2025 – Jul 2026
Jul 2026 1.1 km away 15 homes extended 2021–2025, typically adding 29 m²
27 since energy certificates began (2008)
0 in MK4 4GE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
1,250 hours of spills in 2025 between them (typical neighbourhood: about 36)
73 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 67 planned, approved or being built and 13 running (136 MW between them). Those within 5 km are on the map above.
Rooftop solar DHL Supply Chain, Pendeen Crescent -Solar Panels Approved, not yet built · 1 MW
Jul 2024 1.4 km away Rooftop solar Pendeen Crescent, Snelshall East - Solar panels Planning application in · 1 MW
Apr 2024 1.4 km away Rooftop solar Delico, Steinbeck Crescent - Solar Panels Approved, not yet built · 2 MW
Apr 2023 1.5 km away Battery storage Kelvin Drive - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 3.0 km away Battery storage Pear Tree Lane, Bleak Hall - Micro Energy Storage Approved, not yet built · 200 kW
Feb 2025 3.6 km away Rooftop solar Winterhill House - Solar Panels Approved, not yet built · 180 kW
Nov 2021 3.7 km away Battery storage Grafton Street, End Of Dunsby Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 3.9 km away Battery storage Duckworth Court, Oldbrook Boulevard - Micro Energy Storage Facility Approved, not yet built · 200 kW
Mar 2025 4.0 km away Solar farm Oaks Farm - Solar Farm Approved, not yet built · 37 MW
May 2026 4.1 km away Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 4.1 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major, planned Snelshall Street H6 To H7, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Nov 2026 to Nov 2026 550 m away Major Childs Way V1 To V2, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Nov 2026 to Nov 2026 600 m away Standard Barnsdale Drive, Milton Keynes New service connection · ESP ELECTRICITY · Two-way signals
Nov 2026 to Nov 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 14.4 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 19.7 km away Decided decided Oct 2011 20.3 km away Decided decided Oct 2019 21.6 km away Decided decided Sept 2014 22.9 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 27.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
The Church Of The Latterday Saints, The High Street - Battery Storage Approved, not yet built · 200 kW
Running nearest: The Hazeley Academy (rooftop solar, 2.2 km); Bletchley Phase II (landfill gas, 3.3 km); Land At Potash Farm (solar farm, 4.9 km); Falcon Project (battery storage, 5.1 km); Stony Energy Storage Facility (battery storage, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.