Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Tattenhoe & Emerson Valley › Postcode MK4 3FD What's changing near MK4 3FD Within 2 km, around Tattenhoe & Emerson Valley in Milton Keynes. Building, planning, schools, transport, prices and crime.
354 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Tattenhoe & Emerson Valley, 2024 → 2025 (council +1.3%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · May 2026 – Oct 2026
Oct 2026 1.1 km away New homes 24 new homes completed 10 flats, 14 houses · Apr 2026 – Oct 2026
Oct 2026 1.0 km away New homes 11 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 650 m away New homes 9 new homes completed houses · May 2026 – Oct 2026
Oct 2026 1.4 km away New homes 8 new homes completed 1 flats, 7 houses · Nov 2025 – Oct 2026
Oct 2026 600 m away New homes 6 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 1.3 km away New homes 7 new homes completed 2 flats, 5 houses · Oct 2025 – Sep 2026
Sept 2026 700 m away New homes 12 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 700 m away New homes 6 new homes completed houses · Feb 2026 – Sep 2026
Sept 2026 1.4 km away New homes 23 new homes completed houses · Aug 2025 – Aug 2026
Aug 2026 600 m away New homes 19 new homes completed houses · Nov 2025 – Aug 2026
Aug 2026 550 m away New homes 13 new homes completed houses · Nov 2025 – Aug 2026
Aug 2026 1.4 km away 11 homes extended 2021–2025, typically adding 24 m²
13 since energy certificates began (2008)
2 in MK4 3FD itself
Extended certificate 2021 Extended certificate 2010 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
1,250 hours of spills in 2025 between them (typical neighbourhood: about 36)
73 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 66 planned, approved or being built and 13 running (136 MW between them). Those within 5 km are on the map above.
Rooftop solar DHL Supply Chain, Pendeen Crescent -Solar Panels Approved, not yet built · 1 MW
Jul 2024 700 m away Rooftop solar Pendeen Crescent, Snelshall East - Solar panels Planning application in · 1 MW
Apr 2024 750 m away Rooftop solar Delico, Steinbeck Crescent - Solar Panels Approved, not yet built · 2 MW
Apr 2023 750 m away Battery storage Kelvin Drive - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 3.3 km away Battery storage Pear Tree Lane, Bleak Hall - Micro Energy Storage Approved, not yet built · 200 kW
Feb 2025 3.8 km away Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 3.9 km away Battery storage Grafton Street, End Of Dunsby Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 4.0 km away Rooftop solar Third Avenue, Bletchley - Solar Panels Approved, not yet built · 230 kW
Nov 2025 4.0 km away Rooftop solar Winterhill House - Solar Panels Approved, not yet built · 180 kW
Nov 2021 4.0 km away Battery storage Dukes Drive, Princes Way - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 4.2 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 14.1 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 19.6 km away Decided decided Oct 2011 20.2 km away Decided decided Sept 2014 22.3 km away Decided decided Oct 2019 22.4 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 27.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 2.6 km); The Hazeley Academy (rooftop solar, 2.9 km); Land At Potash Farm (solar farm, 5.4 km); Falcon Project (battery storage, 5.5 km); Stony Energy Storage Facility (battery storage, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.