What's changing near MK4 3BN
Within 2 km, around Tattenhoe & Emerson Valley in Milton Keynes. Building, planning, schools, transport, prices and crime.
461new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.6%like-for-like prices in Tattenhoe & Emerson Valley, 2024 → 2025 (council +1.3%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.6 km away - New homes
8 new homes completed1 flats, 7 houses · Nov 2025 – Oct 2026
Oct 2026
1.6 km away - New homes
7 new homes completed2 flats, 5 houses · Oct 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
12 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
6 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
23 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.6 km away - New homes
19 new homes completedhouses · Nov 2025 – Aug 2026
Aug 2026
1.5 km away - New homes
13 new homes completedhouses · Nov 2025 – Aug 2026
Aug 2026
1.7 km away - New homes
13 new homes completed11 flats, 2 houses · Mar 2026 – Aug 2026
Aug 2026
2.0 km away - New homes
8 new homes completedhouses · Aug 2025 – Jul 2026
Jul 2026
1.6 km away - New homes
6 new homes completedhouses · Mar 2026 – May 2026
May 2026
1.6 km away - New homes
5 new homes completedhouses · Mar 2026
Mar 20261.6 km away
12homes extended 2021–2025, typically adding 26 m²
23since energy certificates began (2008)
1in MK4 3BN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 13 running (133 MW between them). Those within 5 km are on the map above.
- Rooftop solar
DHL Supply Chain, Pendeen Crescent -Solar PanelsApproved, not yet built · 1 MW
Jul 2024
800 m away - Rooftop solar
Pendeen Crescent, Snelshall East - Solar panelsPlanning application in · 1 MW
Apr 2024
1000 m away - Rooftop solar
Delico, Steinbeck Crescent - Solar PanelsApproved, not yet built · 2 MW
Apr 2023
1.5 km away - Battery storage
Kelvin Drive - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025
2.6 km away - Battery storage
Pear Tree Lane, Bleak Hall - Micro Energy StorageApproved, not yet built · 200 kW
Feb 2025
2.8 km away - Battery storage
Watling Street - Micro Energy StorageApproved, not yet built · 200 kW
Aug 2025
2.9 km away - Battery storage
Grafton Street, End Of Dunsby Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025
2.9 km away - Rooftop solar
Third Avenue, Bletchley - Solar PanelsApproved, not yet built · 230 kW
Nov 2025
3.0 km away - Rooftop solar
Winterhill House - Solar PanelsApproved, not yet built · 180 kW
Nov 2021
3.2 km away - Battery storage
Dukes Drive, Princes Way - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
3.3 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Fulmer Street H7 To H8, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Nov 2026
950 m away - Minor
Portrush Close, BletchleyHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Minor
Tweed Drive, BletchleyHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
15.1 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
18.6 km away - Decideddecided Oct 2011
19.2 km away - Decideddecided Sept 2014
21.7 km away - Decideddecided Oct 2019
22.3 km away - Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026
27.2 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 2.5 km); The Hazeley Academy (rooftop solar, 3.1 km); Falcon Project (battery storage, 4.7 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 6.0 km); Land At Potash Farm (solar farm, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.