Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
15hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Anglian Water
Sewers At Village Roadinto Trib River Great Ouse4 spills, 15 hours in 2025
Atlas Converting Equipment Limited, Wolseley Road - Solar PanelsApproved, not yet built · 300 kW
Mar 2024 5.1 km away
Rooftop solar
Pilgrims Pre Preparatory School, Brickhill Drive - Solar PanelsApproved, not yet built · 180 kW
Aug 2025 5.3 km away
Running nearest: Clapham solar farm (solar farm, 5.1 km); Twinwoods Heat & Power CHP (energy from waste, 6.2 km); Elstow Landfill Site (landfill gas, 6.4 km); L'Field Stewartby Landfill Site (landfill gas, 7.4 km); Rookery South (energy from waste, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · North of Houghton Regis Dunstable Bedfordshire
decided Sept 2014 26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.