Country England and Wales › Region East of England › Council Bedford › Neighbourhood Bromham & Biddenham › Postcode MK43 8LA What's changing near MK43 8LA Within 2 km, around Bromham & Biddenham in Bedford. Building, planning, schools, transport, prices and crime.
48 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.5% like-for-like prices in Bromham & Biddenham, 2024 → 2025 (council +2.9%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed houses · Feb 2025 – Jun 2025
Jun 2025 1.4 km away New homes 14 new homes completed houses · Nov 2024 – Apr 2025
Apr 2025 1.5 km away New homes 12 new homes completed houses · Nov 2024 – Feb 2025
Feb 2025 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 27 m²
14 since energy certificates began (2008)
2 in MK43 8LA itself
Extended certificate 2025 Extended certificate 2022 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
15 hours of spills in 2025 between them (typical neighbourhood: about 36)
4 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 7 running (107 MW between them). Those within 5 km are on the map above.
Rooftop solar Oakley Primary Academy, Station Road - Solar Panels & ASHP Approved, not yet built · 2 MW
Feb 2023 1.8 km away Rooftop solar Towers Health And Racquets Club, Clapham Road - Solar Panels Approved, not yet built · 280 kW
May 2023 3.1 km away Rooftop solar Bedford Modern School, Manton Lane - Solar Panels Approved, not yet built · 330 kW
May 2026 3.3 km away Solar farm Clapham Plateau - Solar Farm Approved, not yet built · 6 MW
Jan 2023 3.3 km away Battery storage Thurleigh Road - Battery Energy Storage Approved, not yet built · 69 MW
Jan 2024 3.5 km away Solar farm Twinwood Road Oakley And Clapham, Thurleigh Road - Solar Farm Approved, not yet built · 50 MW
Feb 2026 4.4 km away Rooftop solar Bedford School, De Parys Avenue - Solar Panels Approved, not yet built · 210 kW
May 2026 4.7 km away Solar farm Elstow Landfill Site Being built · 6 MW
Dec 2021 4.7 km away Rooftop solar Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels Approved, not yet built · 180 kW
Aug 2025 4.7 km away Rooftop solar Systems House Approved, not yet built · 200 kW
Oct 2021 5.2 km away Rooftop solar Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2011 10.5 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 10.9 km away Recommendation East Park Energy Generating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station. application due September 2025 15.5 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 16.8 km away Decided decided Aug 2022 24.0 km away Decided decided Oct 2019 26.1 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Clapham solar farm (solar farm, 4.0 km); Twinwoods Heat & Power CHP (energy from waste, 5.1 km); Elstow Landfill Site (landfill gas, 6.8 km); L'Field Stewartby Landfill Site (landfill gas, 8.3 km); Rookery South (energy from waste, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.