Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
27 new homes completedhouses · Oct 2024 – May 2025
May 2025 1.7 km away
New homes
47 new homes completedhouses · Oct 2024 – Apr 2025
Apr 2025 1.6 km away
New homes
30 new homes completed7 flats, 23 houses · Oct 2024 – Mar 2025
Mar 2025 1.9 km away
New homes
14 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
Battery storage
Duckworth Court, Oldbrook Boulevard - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Mar 2025 3.0 km away
Battery storage
Dukes Drive, Princes Way - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025 3.0 km away
Running nearest: Bletchley Phase II (landfill gas, 2.9 km); The Hazeley Academy (rooftop solar, 3.1 km); Falcon Project (battery storage, 4.2 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 5.6 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · Junction 10a M1 Luton
decided Oct 2013 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.