Country England and Wales › Region East of England › Council Bedford › Neighbourhood Kempston North › Postcode MK42 8TH What's changing near MK42 8TH Within 2 km, around Kempston North in Bedford. Building, planning, schools, transport, prices and crime.
156 new homes completed within 2 km, last 2 years
564 homes given permission on brownfield sites since 2021
+4.8% like-for-like prices in Kempston North, 2024 → 2025 (council +2.9%)
-8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed flats · Sep 2026
Sept 2026 2.0 km away New homes 14 new homes completed 6 flats, 8 houses · Sep 2025 – Sep 2026
Sept 2026 1.5 km away New homes 18 new homes completed houses · Dec 2024 – Jul 2026
Jul 2026 1.6 km away New homes 6 new homes completed houses · Jan 2026 – Jul 2026
Jul 2026 1.6 km away New homes 22 new homes completed 4 flats, 18 houses · Mar 2026 – Jun 2026
Jun 2026 1.6 km away New homes 31 new homes completed 1 flats, 30 houses · Mar 2025 – Dec 2025
Dec 2025 1.5 km away New homes 9 new homes completed flats · Jun 2025
Jun 2025 400 m away New homes 24 new homes completed flats · Feb 2025
Feb 2025 1.8 km away New homes 7 new homes completed houses · Oct 2024 – Jan 2025
Jan 2025 2.0 km away School closed School closed: E-Spired Centre of Excellence Other independent school, other independent school (closure)
Jan 2024 1.3 km away New school Jan 2024 950 m away Planning permission 9 homes extended 2021–2025, typically adding 28 m²
11 since energy certificates began (2008)
0 in MK42 8TH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 6 running (90 MW between them). Those within 5 km are on the map above.
Rooftop solar Systems House Approved, not yet built · 200 kW
Oct 2021 1.0 km away Solar farm Elstow Landfill Site Being built · 6 MW
Dec 2021 1.5 km away Rooftop solar Progress Park, Elstow, Site B - Solar Panels Approved, not yet built · 1 MW
Dec 2023 1.9 km away Rooftop solar Progress Park, Elstow, Site A - Solar PV Panels Approved, not yet built · 1 MW
Dec 2023 1.9 km away Rooftop solar Bedfordshire Police Headquarters, Woburn Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 2.1 km away Rooftop solar Atlas Converting Equipment Limited, Wolseley Road - Solar Panels Approved, not yet built · 300 kW
Mar 2024 2.2 km away Rooftop solar Bedford School, De Parys Avenue - Solar Panels Approved, not yet built · 210 kW
May 2026 2.5 km away Rooftop solar Bedford Academy, Mile Road - Solar Panels Approved, not yet built · 150 kW
Jun 2022 2.5 km away Rooftop solar Bedford Modern School, Manton Lane - Solar Panels Approved, not yet built · 330 kW
May 2026 2.6 km away Rooftop solar Marsh Leys Farm, Woburn Road - Photovoltaics Approved, not yet built · 520 kW
Feb 2024 3.1 km away Rooftop solar Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major, planned Ford End Road, Bedford Highway improvement works · BEDFORD BOROUGH COUNCIL · Stop/go boards
Feb 2027 to Feb 2027 800 m away Major, planned Ford End Road, Bedford Highway improvement works · BEDFORD BOROUGH COUNCIL · Road closure
Feb 2027 to Feb 2027 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2011 7.6 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 8.1 km away Recommendation East Park Energy Generating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station. application due September 2025 16.7 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 20.9 km away Decided decided Aug 2022 22.7 km away Decided decided Sept 2014 23.9 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Elstow Landfill Site (landfill gas, 2.7 km); L'Field Stewartby Landfill Site (landfill gas, 5.6 km); Clapham solar farm (solar farm, 5.7 km); Rookery South (energy from waste, 6.1 km); Twinwoods Heat & Power CHP (energy from waste, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.