Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
14 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 1.5 km away
School closed
School closed: The Grove Independent SchoolOther independent school, other independent school (closure)
Dec 2023 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Third Avenue, Bletchley - Solar PanelsApproved, not yet built · 230 kW
Nov 2025 2.5 km away
Rooftop solar
The Milton Keynes Academy, Fulwoods Drive - Solar PanelsApproved, not yet built · 350 kW
Dec 2025 2.7 km away
Running nearest: The Hazeley Academy (rooftop solar, 3.0 km); Falcon Project (battery storage, 3.4 km); Bletchley Phase II (landfill gas, 3.5 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 5.3 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · Junction 10a M1 Luton
decided Oct 2013 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.