Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
The Milton Keynes Academy, Fulwoods Drive - Solar PanelsApproved, not yet built · 350 kW
Dec 2025 1.9 km away
Rooftop solar
Dawson Road, Bletchley - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 2.2 km away
Running nearest: Falcon Project (battery storage, 3.0 km); The Hazeley Academy (rooftop solar, 3.9 km); Bletchley Phase II (landfill gas, 3.9 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 4.4 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · Junction 10a M1 Luton
decided Oct 2013 29.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.