Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Thurleigh Road - Battery Energy StorageApproved, not yet built · 69 MW
Jan 2024 3.9 km away
Rooftop solar
Bedford Academy, Mile Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2022 3.9 km away
Running nearest: Clapham solar farm (solar farm, 3.0 km); Twinwoods Heat & Power CHP (energy from waste, 4.8 km); Elstow Landfill Site (landfill gas, 5.6 km); L'Field Stewartby Landfill Site (landfill gas, 9.1 km); Rookery South (energy from waste, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · North of Houghton Regis Dunstable Bedfordshire
decided Sept 2014 27.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.