3new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.2%like-for-like prices in Bletchley North West, 2024 → 2025 (council +1.3%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New schoolDec 2020
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 25 m²
34since energy certificates began (2008)
3in MK3 7UN itself
- Extendedcertificate 2019
- Extendedcertificate 2017
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
65 planned, approved or being built and 11 running (111 MW between them). Those within 5 km are on the map above.
- Battery storage
Watling Street - Micro Energy StorageApproved, not yet built · 200 kW
Aug 2025
1.6 km away - Rooftop solar
Third Avenue, Bletchley - Solar PanelsApproved, not yet built · 230 kW
Nov 2025
1.7 km away - Battery storage
Grafton Street, End Of Dunsby Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025
1.7 km away - Rooftop solar
DHL Supply Chain, Pendeen Crescent -Solar PanelsApproved, not yet built · 1 MW
Jul 2024
1.9 km away - Battery storage
Pear Tree Lane, Bleak Hall - Micro Energy StorageApproved, not yet built · 200 kW
Feb 2025
2.0 km away - Rooftop solar
Pendeen Crescent, Snelshall East - Solar panelsPlanning application in · 1 MW
Apr 2024
2.1 km away - Battery storage
Dukes Drive, Princes Way - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
2.1 km away - Battery storage
Kelvin Drive - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025
2.1 km away - Rooftop solar
Thornbury, West Ashland - Solar Photovoltaic SystemApproved, not yet built · 880 kW
Mar 2023
2.2 km away - Rooftop solar
Dawson Road, Bletchley - Solar Photovoltaic PanelsPlanning application in · 260 kW
Oct 20212.3 km away
Road and street works within 1 km
4 permitted works running now or planned.
- Standard
Fulmer Street H7 To H8, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Nov 2026
450 m away - Standard
Rusland Circus, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
1000 m away - Minor
Berwick Drive, BletchleyHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
Tweed Drive, BletchleyHighway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
16.3 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
17.3 km away - Decideddecided Oct 2011
17.8 km away - Decideddecided Sept 2014
20.7 km away - Decideddecided Oct 2019
22.5 km away - Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026
26.7 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 2.7 km); The Hazeley Academy (rooftop solar, 3.9 km); Falcon Project (battery storage, 4.1 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 4.7 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.