Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Bletchley North West › Postcode MK3 7AJ What's changing near MK3 7AJ Within 2 km, around Bletchley North West in Milton Keynes. Building, planning, schools, transport, prices and crime.
2 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+5.2% like-for-like prices in Bletchley North West, 2024 → 2025 (council +1.3%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school Dec 2020 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 31 m²
21 since energy certificates began (2008)
0 in MK3 7AJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
26 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 70 planned, approved or being built and 13 running (108 MW between them). Those within 5 km are on the map above.
Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 1.4 km away Rooftop solar Third Avenue, Bletchley - Solar Panels Approved, not yet built · 230 kW
Nov 2025 1.4 km away Battery storage Dukes Drive, Princes Way - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 1.6 km away Rooftop solar Unit 2, Watling Street - Solar Panels Approved, not yet built · 230 kW
Jul 2024 1.9 km away Battery storage Grafton Street, End Of Dunsby Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 2.0 km away Rooftop solar DHL Supply Chain, Pendeen Crescent -Solar Panels Approved, not yet built · 1 MW
Jul 2024 2.0 km away Rooftop solar Dawson Road, Bletchley - Solar Photovoltaic Panels Planning application in · 260 kW
Oct 2021 2.1 km away Rooftop solar Pendeen Crescent, Snelshall East - Solar panels Planning application in · 1 MW
Apr 2024 2.2 km away Rooftop solar Thornbury, West Ashland - Solar Photovoltaic System Approved, not yet built · 880 kW
Mar 2023 2.2 km away Rooftop solar The Premier Academy, Saffron Street - Solar Panels Approved, not yet built
Dec 2025 2.3 km away Road and street works within 1 km 2 permitted works running now or planned.
Minor Berwick Drive, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away Minor Tweed Drive, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 16.3 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 17.1 km away Decided decided Oct 2011 17.6 km away Decided decided Sept 2014 20.1 km away Decided decided Oct 2019 23.2 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 27.2 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 2.3 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 4.4 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 4.5 km); The Hazeley Academy (rooftop solar, 4.6 km); Falcon Project (battery storage, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.