Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Bletchley West › Postcode MK3 6EZ What's changing near MK3 6EZ Within 2 km, around Bletchley West in Milton Keynes. Building, planning, schools, transport, prices and crime.
45 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.8% like-for-like prices in Bletchley West, 2024 → 2025 (council +1.3%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Feb 2026 – Sep 2026
Sept 2026 2.0 km away New homes 16 new homes completed houses · Sep 2025
Oct 2025 1.8 km away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.8 km away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.8 km away New homes 6 new homes completed flats · Sep 2025
Oct 2025 1.8 km away New school Jul 2021 1.7 km away New school Dec 2020 400 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 24 m²
29 since energy certificates began (2008)
0 in MK3 6EZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
146 hours of spills in 2025 between them (typical neighbourhood: about 36)
29 spill events counted
Anglian Water Newton Longville-Whaddon Road Ps into Trib Newton Longville Brook 21 spills, 119 hours in 2025
1.9 km away Anglian Water Selbourne Avenue Pumping Station into Newton Longville Brook 8 spills, 26 hours in 2025
650 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 71 planned, approved or being built and 13 running (108 MW between them). Those within 5 km are on the map above.
Battery storage Dukes Drive, Princes Way - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 1.6 km away Rooftop solar Third Avenue, Bletchley - Solar Panels Approved, not yet built · 230 kW
Nov 2025 1.8 km away Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 1.9 km away Rooftop solar The Premier Academy, Saffron Street - Solar Panels Approved, not yet built
Dec 2025 2.0 km away Rooftop solar DHL Supply Chain, Pendeen Crescent -Solar Panels Approved, not yet built · 1 MW
Jul 2024 2.0 km away Rooftop solar Pendeen Crescent, Snelshall East - Solar panels Planning application in · 1 MW
Apr 2024 2.1 km away Rooftop solar Sir Herbert Leon Academy - Solar Panels Approved, not yet built · 200 kW
Apr 2021 2.2 km away Rooftop solar Unit 2, Watling Street - Solar Panels Approved, not yet built · 230 kW
Jul 2024 2.2 km away Battery storage Strangford Drive, Skene Close - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 2.5 km away Battery storage Strangford Drive, Drayton Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 2.5 km away Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major Cottingham Grove, Bletchley Utility repair and maintenance works · ANGLIAN WATER · Road closure
Oct 2026 to Oct 2026 800 m away Minor Newton Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026 550 m away Minor Buckingham Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Multi-way signals
Dec 2026 to Dec 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 15.9 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 17.3 km away Decided decided Oct 2011 17.9 km away Decided decided Sept 2014 19.7 km away Decided decided Oct 2019 23.8 km away Decided decided Oct 2013 27.5 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 1.6 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 4.5 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 4.7 km); The Hazeley Academy (rooftop solar, 5.0 km); Falcon Project (battery storage, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.