Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
146hours of spills in 2025 between them (typical neighbourhood: about 36)
29spill events counted
Anglian Water
Newton Longville-Whaddon Road Psinto Trib Newton Longville Brook21 spills, 119 hours in 2025
900 m away
Anglian Water
Selbourne Avenue Pumping Stationinto Newton Longville Brook8 spills, 26 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 35 postcodes nearby had new homes completed in the last two years.
Battery storage
Grafton Street, End Of Dunsby Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025 3.6 km away
Rooftop solar
Unit 2, Watling Street - Solar PanelsApproved, not yet built · 230 kW
Jul 2024 3.7 km away
Running nearest: Bletchley Phase II (landfill gas, 1.2 km); The Hazeley Academy (rooftop solar, 4.3 km); Falcon Project (battery storage, 5.9 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 6.0 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · Junction 10a M1 Luton
decided Oct 2013 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.